This tender closed on 9 July 2026. The deadline passed 140 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Electricity – Green power supply for City Kreuztal 2027–2028
Original: Electricity – Ökostrombelieferung für die Stadt Kreuztal für 2027 und 2028
Stadt Kreuztal
- Value
- Not stated · check listing
- Closes
- 9 Jul 2026Closing date passed
- Where
- Germany
- Contract
- Supplies · Government
In context
This is a contract notice published by a government body covering the supply of goods. Bids are invited through an open procedure. Delivery covers Germany and the European Union (Europe). It is classified under Renewable Energy against the sustainability taxonomy rather than matched on keywords.
Summary
City of Kreuztal seeks a green electricity supply contract for 241 consumption points (4.5M kWh/year) for 2027–2028. Bidders must be renewable-energy suppliers or aggregators capable of delivering certified green power to a municipal customer.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
The City of Kreuztal (Stadt Kreuztal) is procuring a new green electricity (Ökostrom) supply contract to cover its full electricity demand for the years 2027 and 2028. The contract encompasses the supply of the entire green electricity requirement for all tendered consumption points (Abnahmestellen). There are 241 consumption points in total, of which 7 are RLM (load profile metering / registered load measurement) connections. The total annual consumption is approximately 4,533,341 kWh. The successful supplier will be required to deliver certified renewable (green) electricity across all sites for the two-year supply period.
Key requirements
- Certified green/renewable electricity supply (Ökostrom)
- Coverage of 241 consumption points (7 RLM metered)
- Annual volume: 4,533,341 kWh for 2027–2028
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)