This tender closed on 8 September 2026. The deadline passed 79 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Electricity – Stromausschreibung (Laser Zentrum Hannover e.V.)
KWL mbH
- Value
- Not stated · check listing
- Closes
- 8 Sep 2026Closing date passed
- Where
- Germany
- Contract
- Supplies · Utility
In context
This is a contract notice published by a utility covering the supply of goods. Bids are invited through an open procedure. Delivery covers Germany and the European Union (Europe). It is classified under Renewable Energy against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures renewable electricity (green power) supply for the Laser Zentrum Hannover research facility for 2027–2028, requiring 1.9 GWh/year from certified renewable sources (wind, solar, hydro, geothermal, biomass). Bidders must be licensed electricity suppliers capable of delivering 100% renewable energy to a single German offtake point.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Procurement of electricity (renewable energy) for the Laser Zentrum Hannover. The supply contract covers a single consumption point with a projected annual consumption of 1,900,000 kWh for both 2027 and 2028. The delivery period runs from 01 January 2027, 00:00 hours to 31 December 2028, 24:00 hours (two years). All electricity must be sourced exclusively from renewable sources including hydropower (including wave, tidal, salt gradient and current energy), wind energy, solar radiation, geothermal energy, or biomass (biogas, landfill gas, sewage gas) and the biodegradable fraction of household and industrial waste. Electricity from fossil fuel or nuclear power plants is not permitted. Detailed specifications are contained in the performance description and tender documents.
Bidder eligibility
Bidders must be able to supply electricity exclusively from renewable energy sources as defined. Suppliers must comply with German and EU regulatory requirements for electricity supply.
Key requirements
- 100% renewable electricity from wind, solar, hydro, geothermal, or biomass sources
- No fossil fuels or nuclear energy permitted
- Supply period 01.01.2027–31.12.2028 (24 months)
- Annual consumption 1.9 GWh for single metering point in Hannover
- Compliance with German renewable energy certification standards
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)