This tender closed on 17 September 2026. The deadline passed 70 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Electricity – Stromausschreibung (Stadt Clausthal-Zellerfeld)
KWL mbH
- Value
- Not stated · check listing
- Closes
- 17 Sep 2026Closing date passed
- Where
- Germany
- Contract
- Supplies · Utility
In context
This is a contract notice published by a utility covering the supply of goods. Bids are invited through an open procedure. Delivery covers Germany and the European Union (Europe). It is classified under Renewable Energy against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures renewable electricity (green power) supply for approximately 98 consumption points in Clausthal-Zellerfeld, Germany, for 2027–2028, with a requirement that all electricity must originate from renewable sources (wind, solar, hydro, geothermal, biomass). Bidders must be licensed electricity suppliers capable of delivering ~795,500 kWh/year of certified renewable energy.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Procurement of electrical energy (renewable electricity/Ökostrom) for Stadt Clausthal-Zellerfeld in Lower Saxony (Niedersachsen), Germany. The contract covers approximately 98 consumption points with a projected annual consumption of 795,521 kWh for each of the years 2027 and 2028. The electricity supply period runs from 1 January 2027 (00:00) to 31 December 2028 (24:00), totaling two years. Individual supply start dates for specific consumption points may vary as detailed in the performance specification and attachments. All supplied electricity must be generated exclusively from renewable sources including hydropower, wind energy, solar radiation, geothermal energy, and biomass (biogas, landfill gas, sewage gas), or from the biodegradable fraction of household and industrial waste. Electricity from fossil fuel or nuclear sources is not permitted.
Bidder eligibility
Suppliers must be able to provide electricity exclusively from renewable energy sources as defined (hydropower, wind, solar, geothermal, biomass, and biodegradable waste-derived electricity). Suppliers cannot offer electricity from fossil fuels or nuclear power. Further detailed eligibility requirements are contained in the tender documentation (Vergabeunterlagen).
Key requirements
- Electricity supply must be 100% from renewable sources (wind, solar, hydro, geothermal, biomass, biogas)
- No fossil fuels or nuclear energy permitted
- Supply period: 1 January 2027 – 31 December 2028 (2 years)
- Approximately 98 consumption points across Stadt Clausthal-Zellerfeld
- Annual consumption ~795,521 kWh for each year
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)