Skip to content
Raise Lens
Tender · TED (EU)Closed

Electricity – Stromlieferung ab 2027

Abwasserzweckverband Heidelberg

Value
Not stated · check listing
Closes
6 Jul 2026Closing date passed
Where
Germany
Contract
Supplies · Utility

In context

This is a contract notice published by a utility covering the supply of goods. Bids are invited through an open procedure. Delivery covers Germany (Europe). It is classified under Renewable Energy and Energy Efficiency against the sustainability taxonomy rather than matched on keywords.

Summary

Electricity procurement of approximately 4.6–6.2 million kWh annually for two metering points of a wastewater utility, with optional integration of on-site renewable generation via a balance-group model. Bidders should be energy suppliers capable of managing complex grid-feed arrangements and optional self-supply balancing.

Summary by Raise Lens from the official notice · 24 Jun 2026Accurate?

This tender has closed

Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.

About this tender

The procurement concerns the base/spot purchase of approximately 4.6 million kWh of electricity for two RLM (registered load metering) offtake points operated by the Abwasserzweckverband Heidelberg (Heidelberg Wastewater Association). The contract covers electricity supply starting from 2027. An optional but binding element involves the integration of the buyer's own renewable energy (EE) plant output, estimated at approximately 1.6 GWh per annum, into the supply via a 'Durchleitung' (wheeling) arrangement through the public grid — also referred to as a 'Bilanzkreismodell' (balancing group model) or 'kommunale Selbstversorgung' (municipal self-supply). Almost the entire self-generated quantity is to be wheeled through the grid, with any remainder marketed at the appropriate market. If the Bilanzkreismodell is implemented, approximately 2.8 GWh of base-load volume is to be purchased in 2027 and approximately 4.4 GWh per annum from 2028 onwards. If no Bilanzkreismodell is implemented, approximately 4.6 GWh in 2027 and approximately 6.2 GWh per annum from 2028 onwards must be covered by purchased base-load electricity. Bidders must offer the optional Bilanzkreismodell as a binding option alongside the standard supply offer. The contract duration begins in 2027 with ongoing annual volumes thereafter.

Key requirements

  • Supply of ~4.6 million kWh annually (2027 onwards) across two RLM metering points
  • Optional balance-group model (Bilanzkreismodell) to integrate ~1.6 GWh/a from buyer's own renewable generation
  • Ability to manage grid feed-through (Durchleitung) and balance-group accounting for self-supply scenario
  • Flexible volume scaling: 2.8 GWh base (2027) + 4.4 GWh (2028+) if balance-group adopted; 4.6 GWh (2027) + 6.2 GWh (2028+) if not
  • Marketing of surplus renewable generation at appropriate market rates

CPV codes

How this compares

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.

This opportunity has closed. Find the next one

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Alert me to similar opportunities →

Quick facts

SourceTED (EU)
Published5 Jun 2026
Closes6 Jul 2026, 00:00 UTC
Buyer typeUtility
TypeSupplies
MethodOpen
DeliveryOn-site
CountryGermany
RegionEurope
Last verified24 Jun 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)