Electricity supply installations – construction of two 110/ 20 kV substations
Original: Electricity supply installations – Jaunu 110/20 kV apakšstaciju ''Launkalne'' un "Saldus" izbūve
Akciju sabiedrība "Sadales tīkls"
- Value
- Not stated · check listing
- Closes
- Not stated · check listing
- Where
- Latvia
- Contract
- Works · Utility
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a utility covering construction and works. Delivery covers Latvia and the European Union (Europe). It is classified under Grid Modernisation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Procurement for construction of two new 110/20 kV electrical substations ('Launkalne' and 'Saldus') in Latvia, funded by EU Recovery Fund. Bidders should be experienced electrical infrastructure contractors capable of substation design, construction, and project supervision.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Procurement for construction of two new 110/20 kV substations: "Launkalne-2" and "Saldus-1" in Latvia. The scope includes construction works (CPV 45315300-1) for electrical supply installations, electrical system design services (CPV 71323100-9), and project documentation supervision (CPV 71248000-8). The project is divided into two lots corresponding to each substation. Financing is from the EU Recovery and Resilience Facility (investment project 1.2.1.5.i) and the RePowerEU initiative, aimed at modernizing the electricity distribution system and increasing the share of renewable energy resources.
Lots
- Lot 1: 110/20 kV substation "Launkalne-2" construction
Construction works, design services, and project supervision for the Launkalne-2 substation
- Lot 2: 110/20 kV substation "Saldus-1" construction
Construction works, design services, and project supervision for the Saldus-1 substation
Key requirements
- Design and construction of two 110/20 kV electrical substations ('Launkalne-2' and 'Saldus-1')
- Project engineering design and supervision services included
- Compliance with EU Recovery Fund and RePowerEU investment criteria for grid modernization and renewable energy integration
- Work divided into two separate lots with A and B subsections per lot
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Grid modernisation covers transmission, distribution, smart meters, interconnectors and the software that balances a network with more variable supply. Funding comes as innovation calls for network operators and suppliers as well as large public tenders for equipment and works. Applicants are usually asked to show technical readiness and experience working with regulated network companies.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)