Skip to content
Raise Lens
Tender · TED (EU)

Electricity – Supply of renewable energy for hospital operator Bad Oeynhausen, 2027–2028

Original: Electricity – Lieferung von Ökostrom für die Krankenhausbetriebsgesellschaft Bad Oeynhausen mbH in 2027 und 2028

Krankenhausbetriebsgesellschaft Bad Oeynhausen mbH Herz- und Diabeteszentrum NRW, vertreten durch VEA Beratungs-GmbH

Value
Not stated · check listing
Closes
Not stated · check listing
Where
Germany
Contract
Supplies · Other

Free accounts: 1 official link a month · Pro: every link

In context

This is a contract notice covering the supply of goods. Delivery covers Germany and the European Union (Europe). It is classified under Renewable Energy against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures approximately 10,916 MWh of renewable electricity for a hospital group in Germany during 2027–2028 via a tranche-based supply model. Bidders should be licensed electricity suppliers capable of delivering certified green power and managing grid-use settlement for a large institutional consumer.

Summary by Raise Lens from the official notice · 4 Jul 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The Krankenhausbetriebsgesellschaft Bad Oeynhausen mbH (Heart and Diabetes Centre NRW), represented by VEA Beratungs-GmbH, has awarded a contract for the supply of green electricity (Ökostrom) for the calendar years 2027 and 2028. The total volume is approximately 10,916 MWh, to be delivered as a horizontal tranche model including handling of grid usage (Netznutzung). The supply is structured as a single lot covering both calendar years, with the delivery period running from 01/01/2027 to 31/12/2028. The procurement was conducted as an open procedure under Directive 2014/24/EU (VgV) and is covered by the Government Procurement Agreement (GPA). The contract was concluded on 28/04/2026 with enercity AG (Hannover, Germany) as the winning bidder. A total of 9 tenders were received, all submitted electronically, of which 4 came from micro, small or medium enterprises.

How bids are scored

Price was the sole award criterion, weighted at 100%. No quality or other sub-criteria were applied.

Key requirements

  • Supply of certified renewable electricity (Ökostrom) totalling ~10,916 MWh across calendar years 2027 and 2028
  • Delivery via tranche model with integrated grid-use settlement and network-access management
  • Bidder must be a licensed electricity supplier capable of long-term institutional supply contracts

Recent prior contract holders

  • enercity AG · 2026Lieferung von Ökostrom für die Krankenhausbetriebsgesellschaft Bad Oeynhausen mbH in 2027 und 2028

Procurement contact

The notice names a procurement contact for clarification questions.

CPV codes

Relevant sectors

How this compares

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published29 Apr 2026
Buyer typeOther
TypeSupplies
DeliveryOn-site
CountryGermany
RegionEurope
CurrencyEUR
SubmissionElectronic submission via e-tender portal (VEA-Ausschreibungen; buyer profile ht
Last verified4 Jul 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)