Energieverbund Goldach: Energiezentrale 2026 Tender
Politische Gemeinde Goldach, vertreten durch Technische Betriebe Goldach
- Value
- Not stated · check listing
- Closes
- 23 Dec 2026
- Where
- Switzerland
- Contract
- Services · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering services. Delivery covers Switzerland (CH-SG). It is classified under Heating and Cooling, Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
The Goldach municipality is procuring general planner services for the energy centre of a lake-water heat pump district heating network, covering SIA phases 32 to 53 across civil, structural, MEP, and BIM disciplines. It suits multidisciplinary engineering and planning firms with large heating-network or energy-centre experience, rather than small single-discipline specialists.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The Politische Gemeinde Goldach, represented by Technische Betriebe Goldach (TBG), is procuring general planning services for Teilprojekt 1 (Energiezentrale) of the Energieverbund Goldach. The energy centre is part of a district heating and cooling system that would use lake water from the new Seewasserfassung of the Seewasserwerk Riet II, being built by the Regionale Wasserversorgung St.Gallen (RWSG), with large-scale heat pumps supplying heat to households, public buildings and commercial users. Teilprojekt 2 (Verteilnetz) is a separate sub-project and is not part of this tender. The contract covers SIA phases 32 (Bauprojekt) through 53 (Inbetriebnahme) for the energy centre. The general planner mandate includes overall management and coordination (including construction management), chief site supervision, BIM management, civil engineering including specialist earthworks, structural and building engineering, heating/cooling pipework including house connections, architecture, landscape architecture, fire safety, plant engineering, HVAC, electrical engineering, MSRL and building automation, building physics and geology. Execution is at 9403 Goldach, SG, from 31.03.2027 to 30.12.2030, and the contract may be extended. Lump-sum and global offers, and offers based on time-and-materials rates, are excluded. Variants and partial tenders are not permitted. Bidding consortia are allowed, with a lead company that must be designated. Subcontractors are permitted. Certain pre-involved firms (HOLINGER AG, Contegra AG Integrale Planung, RKL AG, EVU-Beratung AG, Morgenegg-Gervasi Architektur AG, Ehle Wirth Architekten AG and Kobus und Partner GmbH) are admitted to the procedure, and some of them are designated as mandatory subplanners. The electrical work in the transformer room is carved out and handled by EVU-Beratung AG directly, so it is excluded from the GP fee.
Bidder eligibility
EK1 Technical capability with company references, one per criterion (EK1.1 to EK1.5). Each reference must show SIA phases 32-53 completed or substantially realised, with project completion within the last 10 years: - EK1.1 Overall management/coordination (incl. construction management): total construction costs above CHF 3 million. - EK1.2 Civil engineering (Tiefbau). - EK1.3 Building/structural engineering (Hochbau/Statik): construction costs in the discipline above CHF 2 million and volume above 3,000 m³. - EK1.4 Plant engineering (Anlagebau): a new heat pump with thermal output above 2 MW using a natural refrigerant, and/or a boiler with thermal output above 5 MW. - EK1.5 Geology. A single reference may cover several criteria if the requirements are clearly shown. Two references may together cover all required phases. References for EK1.2 to EK1.5 may come from a subplanner, with written confirmation that the subplanner will perform the work. EK2 Financial proportionality: the average annual fee (total offered fee including ancillary costs, after discount, excluding VAT, divided by three) must not exceed 30% of the average annual turnover of the relevant business unit (2023, 2024 and 2025, excluding VAT, divided by three). Annual turnover figures must be provided in Document C. Consortium turnover is summed by year. EK3 BIM capability: one project reference showing BIM experience on a comparable task, with SIA phase 3 completed. Subplanner references are allowed with a written confirmation. The bidder provides the BIM platform, with its specification attached to the offer and Document C2 completed. EK4 Organisational and financial capacity: signed self-declaration.
How bids are scored
Weighted award criteria (total 100%): - ZK1 Price (30%): total fee including ancillary costs and after discount. The lowest offer receives the maximum score. Offers 100% or more above the lowest price receive zero points. Scoring is linear in between. - ZK2 Project and task analysis (30%), with three sub-criteria of 10% each: (a) the five most significant project-specific challenges, mitigation measures and the two largest opportunities, max 1 A4 page; (b) planned approach, schedule risks, organisation, interfaces and BIM, max 1 A4 page plus schedule and organisation chart; (c) measures for sustainability and circular economy, max 1 A4 page. - ZK3 Competence of key persons (30%): education and experience of the key persons, with one comparable project reference each for the overall project lead (Gesamtleitung/Koordination), the plant engineering specialist (Fachspezialist Anlagenbau) and the chief site supervisor (Chefbauleiter). Completed phases are required. German at native level or at least C1. - ZK4 Presentation (10%): offers are presented by the key persons. The authority may invite only bidders who still have a realistic chance of award. There is no entitlement to a presentation.
Key requirements
- General planner mandate covering SIA 32 to 53 for the energy centre sub-project
- Multidisciplinary scope: civil, structural, piping, HVAC, electrical, plant engineering, BIM and site management
- Supports a lake-water large-scale heat pump thermal network for households and public buildings
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
Named in this notice. Check the official notice for the full list.
- Document C (annual turnover figures for 2023, 2024 and 2025, excluding VAT)
- Document C2 (BIM platform specification)
- BIM platform specification attached to the offer
- Written confirmation from subplanner(s) that they will perform the work (for references EK1.2 to EK1.5)
- Written confirmation for subplanner BIM reference (where used)
- Signed self-declaration (EK4 organisational and financial capacity)
- Company references for EK1.1 to EK1.5
- Project reference for EK3 (BIM experience with SIA phase 3 completed)
- Written designation of the lead company (for bidding consortia)
- Offer on simap.ch
- Presentation by key persons (for shortlisted bidders)