Energy performance actions for CHUV hospital buildings: lighting optimisation ceiling works
Original: Actions à Performance Energétique (APE) pour les bâtiments de la Cité Hospitalière du CHUV - Travaux d'optimisation de l'éclairage CFC 283 Faux-plafonds
CHUV - Constructions ingénierie technique et sécurité (CIT-S)
- Value
- Not stated · check listing
- Closes
- 21 Dec 2026
- Where
- Switzerland
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 27 Nov. This page is open to everyone now.
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Switzerland (Europe). It is classified under Energy Efficiency and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
The CHUV university hospital in Lausanne is procuring energy performance contracting works to upgrade lighting in its buildings, including ceiling opening, modification and replacement across three lots. It suits an electrical or lighting installation contractor, ideally an SME able to deliver lot-level works or subcontract to a larger energy services company.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Ce marché intègre ouverture, fermetures et modifications des faux-plafonds pour la mise à niveau des installations d'éclairage pour les 3 lots suivants : · Lot 1 BH Bâtiment principal de la cité hospitalière · Lot 2 MAT/BU23/AL de la cité hospitalière · Lot 3 option BH étages 12/13/14/15/16/17
Key requirements
- Lighting upgrade works for CHUV hospital buildings in three lots
- Opening, closing and modification of suspended ceilings (CFC 283)
- Energy performance contracting (APE) model with lot-based scope including optional floors 12-17
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)