This tender closed on 22 June 2026. The deadline passed 156 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Engineering design documentation for construction of eight water retention structures
Original: Engineering design services for the construction of civil engineering works – Wykonanie dokumentacji projektowo-kosztorysowej dla zadania pn. Budowa i naprawa 8 obiektów piętrzących w Nadleśnictwie Babki wraz z uzyskaniem niezbędnych decyzji administracyjnych (MRN3)
Skarb Państwa PGL Lasy Państwowe Nadleśnictwo Babki
- Value
- Not stated · check listing
- Closes
- 22 Jun 2026Closing date passed
- Where
- Poland
- Contract
- Services · Government
In context
This is a contract notice published by a government body covering services. Bids are invited through an open procedure. Delivery covers Poland and the European Union (Europe). It is classified under Sustainable Buildings, Water and Biodiversity and Nature and 2 others against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures engineering design documentation and administrative approvals for construction of 8 water retention structures (small-scale hydro-infrastructure) in a state forestry district in Poland, including hydrological surveys, structural design, and cost estimates. Bidders should be civil engineering design firms with experience in water management, environmental permits, and rural/forestry infrastructure projects.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
The subject of this procurement is the preparation of design and cost estimate documentation (dokumentacja projektowo-kosztorysowa) for small lowland water retention structures (mała retencja nizinna) in the Łękno Forest District within Nadleśnictwo Babki (Średa Wielkopolska County). The scope covers obtaining all necessary administrative decisions required to carry out the investment. The investment consists of: construction of a threshold/weir on a ditch at the end of alder swamp habitat in sections 46h and 41r; performing only necessary reinforcement works in locations where the ditch was silted due to erosion; construction of a culvert with a damming structure; and construction of a sluice gate (zastawka) within the Łękno Forest District. The overarching project goal is to increase water retention in the forest by retaining water in two natural water reservoirs. This tender is classified under the MRN3 (Mała Retencja Nizinna 3) programme. The contract covers engineering design services for civil engineering works as defined above, culminating in a complete set of project documentation and cost estimates ready for construction procurement.
Key requirements
- Design documentation (project and cost estimates) for eight small-scale water retention structures (thresholds, culverts, sluice gates)
- Hydrological and soil survey work; engineering drawings for two natural water basins in a lowland forest setting
- Securing all required administrative and environmental permits (water, forestry, land-use decisions) before construction phase
- Experience with rural water management, forest hydrology, and Polish environmental/forestry regulations
Relevant sectors
How this compares
About this sector
About this sector
Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)