This tender closed on 8 June 2026. The deadline passed 170 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Engineering design services for energy efficiency of residential buildings Sector 1 Bucharest
Original: Engineering design services for the construction of civil engineering works – Servicii privind elaborarea documentațiilor tehnico-economice pentru creșterea eficienței energetice a blocurilor de locuințe din Sectorul 1 al Municipiului București
Sector 1 (Sectorul 1 al municipiului Bucuresti)
- Value
- RON 73.2M
- Closes
- 8 Jun 2026Closing date passed
- Where
- Romania
- Contract
- Services · Government
In context
This is a contract notice published by a government body covering services. Bids are invited through a framework agreement. Delivery covers Romania and the European Union (Europe). It is classified under Sustainable Buildings and Energy Efficiency against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures engineering design and technical-economic documentation services for energy efficiency retrofits of residential apartment buildings in Bucharest Sector 1, covering approximately 253 building units across a framework agreement structure. The ideal bidder is an engineering consultancy or design firm with expertise in building energy audits, thermal renovation planning, and compliance documentation for multi-unit residential properties.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
This tender concerns the procurement of technical-economic documentation services for improving the energy efficiency of residential apartment blocks (blocuri de locuințe) in Sector 1 of Bucharest, Romania. The framework agreement covers approximately 409 residential buildings divided into two geographical zones (Lot 1 – Zone A: ~253 stairwells/198 buildings; Lot 2 – Zone B: ~254 stairwells/210 buildings). The scope of services includes: (1) technical expertise and building survey/releveu; (2) geotechnical study including excavations and boreholes; (3) topographic study including OCPI endorsement; (4) historical study where applicable; (5) energy audit and initial energy performance certificate; (6) intervention works approval documentation (DALI) including cost-benefit analysis per HG 907/2016; (7) permits and agreements plus authorization project (DTAC) and execution organization project (DTOE); (8) Technical Project (PTh) and execution details (DE); (9) technical verification by certified project verifiers; (10) technical assistance during construction and up to final reception; (11) post-rehabilitation energy performance certificate; (12) designer's closing statement; (13) as-built technical book and as-built project; (14) support during works contract award procedure; and (15) other studies as required (DNSH, climate change adaptation, environmental studies, RADON study, etc.). The framework agreement has a maximum duration of 48 months. Individual subsequent contracts will range from a minimum of 20 stairwells (~27,421 m² useful area) to a maximum of 30 stairwells (~65,148 m² useful area) for Lot 1, with similar arrangements for Lot 2. The total estimated value of the framework agreement is 73,207,419.80 RON (excluding VAT).
Bidder eligibility
1. REGISTRATION: All economic operators (including subcontractors and third-party supporters) must demonstrate valid trade register enrolment in their country of residence, confirming legal constitution and professional capacity to perform the contract activities. Evidence: ONRC Certificate of Constator / constitutive act or equivalent foreign documents translated into Romanian, required from the top 3 ranked bidders. 2. FINANCIAL STANDING – Average Annual Turnover: The average annual turnover for the last three financial years (2023, 2024, 2025) must be at least: Lot 1 – minimum 6,000,000 RON (excl. VAT); Lot 2 – minimum 5,000,000 RON (excl. VAT). Currency conversion uses BNR average annual exchange rates. Demonstrated via DUAE and, upon request, audited financial statements/balance sheets for 2023–2025. Capacity can be pooled in a consortium or supported by a third party. 3. TECHNICAL/PROFESSIONAL CAPACITY – Similar Experience: Operators must demonstrate that within the last 3 years they have performed/completed similar services consisting of the preparation and/or updating and/or revision of technical-economic documentation (any phase) relating to construction, extension, rehabilitation (capital repairs, consolidation, thermal rehabilitation), or modernisation of at least one civil structure of minimum importance category C. 'Completed' includes partially received services where the deliverable is usable independently, or services received at contract end. Evidence via DUAE and contract lists/references with values, periods, beneficiaries, and confirmation of proper performance, required from top 3 ranked bidders. 4. EXCLUSION GROUNDS: Standard EU Directive 2014/24/EU exclusion grounds apply including criminal organisation, corruption, fraud, terrorism, money laun
How bids are scored
Bids are ranked by a total score: Score = F1 + F2 + F3. F2 = F2.1 + F2.2 + F2.3 + F2.4; F3 = F3.1 + F3.2. The specific weightings for F1 (financial proposal), F2 (technical quality sub-factors), and F3 (expert qualifications sub-factors) are not fully disclosed in the available notice text. In the event of tied scores at positions 1, 2, or 3, tiebreaking proceeds in descending order of individual evaluation factor scores; if still tied, by individual expert scores; if still tied, the contracting authority may request new financial proposals, with the lowest financial proposal winning.
Lots
- Lot 1: Lotul 1 – Zona A – Elaborare documentație tehnico-economică pentru creșterea eficienței energetice a blocurilor de locuințe din Sectorul 1 al Municipiului București – 253 imobile (scări), aproximativ 198 blocuriRON 38.2M
Technical-economic documentation services for energy efficiency improvement of approximately 198 residential apartment blocks (253 stairwells) in Zone A of Sector 1, Bucharest. Minimum subsequent contract: 20 stairwells (~27,421 m² useful area); maximum subsequent contract: 30 stairwells (~65,148 m²). Maximum framework scope: 253 stairwells (~566,786 m² useful area). Required average annual turnover: min. 6,000,000 RON. Duration: 48 months.
- Lot 2: Lotul 2 – Zona B – Elaborare documentație tehnico-economică pentru creșterea eficienței energetice a blocurilor de locuințe din Sectorul 1 al Municipiului București – 254 imobile (scări), aproximativ 210 blocuriRON 35M
Technical-economic documentation services for energy efficiency improvement of approximately 210 residential apartment blocks (254 stairwells) in Zone B of Sector 1, Bucharest. Required average annual turnover: min. 5,000,000 RON. Duration: 48 months.
Key requirements
- Preparation of technical-economic documentation for energy efficiency improvements of multi-unit residential buildings
- Coverage of approximately 253 building units (scări) with total useful floor area up to 566,786 m²
- Framework agreement with minimum scope (92,569 m²) and maximum scope (566,786 m²) for phased delivery across subsecent contracts
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in framework agreements; typical only, not this buyer’s list. Check the official notice.
- Selection questionnaire or qualification form
- Company registration certificate
- Audited financial statements
- Insurance certificates
- Case studies or references for similar work
- Quality, health and safety, and environmental policies