Engineering design services for covered swimming pool reconstruction Neratovice
Original: Engineering design services for the construction of civil engineering works – Zpracování projektové dokumentace rekonstrukce Krytého plaveckého bazénu Neratovice
Město Neratovice
- Value
- Not stated · check listing
- Closes
- Not stated · check listing
- Where
- Czech Republic
- Contract
- Services · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering services. Delivery covers Czechia (Europe). It is classified under Energy Efficiency and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures engineering design services (DSP and DPS documentation levels) for the reconstruction and modernization of a covered swimming pool in Neratovice, Czech Republic, with emphasis on roof replacement, HVAC systems, sauna facility design, building envelope insulation, and interior refurbishment. Bidders should be architectural/engineering firms with experience in building renovation, MEP systems design, and phased construction planning for occupied facilities.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Engineering design services for the reconstruction and modernization of an indoor swimming pool in Neratovice. The project documentation will be prepared at DSP and DPS design levels and shall address: (a) complete roof membrane reconstruction, (b) new HVAC system design including expansion for planned sauna facilities, (c) building modifications related to interior spatial reorganization, (d) sauna facility design including technology, energy requirements, operational solutions and related systems (heating, ventilation, electrical, measurement and control), (e) building insulation and window replacement including thermal bridge elimination, (f) additional building modifications for new operations (kitchen, entrance systems, etc.), (g) all related professional disciplines (structural, building physics, electrical, fire safety, energy), (h) interior design documentation and equipment specifications. The documentation must enable phased implementation if technically feasible, with a Construction Organization Plan describing phasing to avoid disruption to pool operations, particularly swimming school activities. Complete pool closure is limited to maximum 4 months in period June-September. Deliverables include: project documentation (study updates with surveys, building permit documentation, construction execution documentation) and engineering services for obtaining location and building permits.
Key requirements
- Project documentation at DSP and DPS design levels for pool reconstruction and modernization
- Building envelope retrofit including roof replacement, window replacement, and thermal bridge elimination
- HVAC system design including expansion for planned sauna facility with energy and operational solutions
- Phased construction planning to maintain pool operations with maximum 4-month closure window (June–September)
- All related professional disciplines: structural, building physics, electrical, fire safety, energy systems, interior design
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)