This tender closed on 15 July 2026. The deadline passed 134 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Engineering design services for two water-retention structures on Lubiń B stream
Original: Engineering design services – Opracowanie dokumentacji projektowo – kosztorysowej dla zadania „Budowa dwóch urządzeń piętrzących na cieku Lubiń B wraz z uzyskaniem niezbędnych decyzji administracyjnych” (MRN3)
Skarb Państwa Państwowe Gospodarstwo Leśne Lasy Państwowe Nadleśnictwo Kościan
- Value
- Not stated · check listing
- Closes
- 15 Jul 2026Closing date passed
- Where
- Poland
- Contract
- Services · Government
In context
This is a contract notice published by a government body covering services. Delivery covers Poland (Europe). It is classified under Sustainable Buildings, Environmental Justice and Climate Adaptation and 2 others against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures engineering design documentation and administrative approvals for construction of two water-retention structures on the Lubiń B stream in Poland, part of a climate-adaptation forestry project. Bidders should be engineering design firms with expertise in hydrological infrastructure, environmental permitting, and forest-water management.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
The subject of the contract is the preparation of design and cost-estimate documentation (dokumentacja projektowo-kosztorysowa) and the obtaining of all necessary administrative decisions to enable the construction investment to proceed. The scope includes technical coordination with the watercourse manager, Państwowe Gospodarstwo Wodne Wody Polskie Zarząd Zlewni w Poznaniu, regarding the technical aspects of the project. The investment is located in Leśnictwo Jurkowo on cadastral parcel No. 403, cadastral district Wieszkowo, Municipality of Krzywiń, between forest compartments 271h–271f (parcels 7271/5, 7271/3) and 272m–272h (parcels 7272/2, 7272/3, and 7272/4). The project concerns the construction of two damming/water-retaining structures (urządzenia piętrzące) on the watercourse Lubiń B, which constitutes a public flowing waterbody, together with sectional cleaning of inlets to ditches. This work is carried out under the project 'Kompleksowy projekt adaptacji lasów i leśnictwa do zmian klimatu – mała retencja oraz przeciwdziałanie erozji wodnej na terenach nizinnych – kontynuacja (MRN3)' (Comprehensive project for adaptation of forests and forestry to climate change – small water retention and counteracting water erosion in lowland areas – continuation). Detailed provisions on the scope of the contract are contained in the draft contract (Annex 11 to the SWZ), the Description of the Subject of the Contract (Annex 2 to the SWZ), and the Project Implementation Manual (Annex 3 to the SWZ).
Key requirements
- Engineering design and cost documentation for two water-retention structures
- Coordination with water authority (PZW Wody Polskie) and environmental permits
- Site-specific work in Jurkowo forest, Krzywiń municipality, Poland
- Alignment with EU climate-adaptation project (MRN3) on water retention and erosion control
How this compares
About this sector
About this sector
Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)