This tender closed on 5 October 2026. The deadline passed 52 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Engineering design services – Schöpfwerk Niendorf replacement construction
Original: Engineering design services – Schöpfwerk Niendorf - Ersatzneubau
NLWKN Betriebsstelle Lüneburg
- Value
- Not stated · check listing
- Closes
- 5 Oct 2026Closing date passed
- Where
- Germany
- Contract
- Services · Government
In context
This is a contract notice published by a government body covering services. Bids are invited through an open procedure. Delivery covers Germany and the European Union (Europe). It is classified under Environmental Justice, Water and Climate Adaptation and 3 others against the sustainability taxonomy rather than matched on keywords.
Summary
Engineering design services for replacement construction of a pumping station (Schöpfwerk Niendorf) in Germany, incorporating flood protection, energy efficiency, fish-friendly technology, and circular-economy principles. Bidders must be engineering design firms with expertise in hydraulic infrastructure, environmental planning, sustainability assessment, and compliance with EU Water Framework Directive and German climate law.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Engineering design services for the replacement construction (Ersatzneubau) of Schöpfwerk Niendorf, a pumping station. The project encompasses the demolition of the existing facility and construction of a modern facility compliant with current flood protection requirements, water framework directive provisions, and nature conservation standards including fish-friendly pump technology. The design must incorporate lifecycle cost analysis, climate impact assessment (including CO2 shadow prices), sustainable materials, modular construction approaches, and aim for DGNB-certified zero-emission construction sites. Services are divided into two lots and will be commissioned in phases: initially phases 1–2 (preliminary planning), followed by phases 3–4 (design and approval planning) contingent on funding approval. Target for final approval is 2029.
Bidder eligibility
Bidders must demonstrate absence of exclusion grounds and suitability through completed application forms (Anlage 2) and reference data sheets (Anlage 3a and/or 3b). Two-stage EU procurement procedure: selection based on evaluation of application documents using a scoring matrix (Anlage 4). Only the top three qualified applicants per lot will be invited to submit offers and participate in potential negotiations. Preliminary statements acceptable in tender stage; full documentation may be required with bid submission.
How bids are scored
Two-stage procedure with initial qualification evaluation. Qualification phase: bidders assessed via completed application forms and reference sheets scored against a published evaluation matrix (Anlage 4). Top three bidders per lot selected for offer stage. Final award criteria not explicitly detailed in excerpt; likely based on quality and price but weightings not disclosed. Tender reserves right to award first offer without negotiations under VgV § 17 Abs. 11.
Lots
- Lot 1: Umweltplanung (Environmental Planning)
Environmental planning services required for a planning approval application with mandatory environmental impact assessment (UVP). Includes: landscape management plan (§ 26 HOAI), environmental impact study (Anlage 1.1 HOAI), general pre-screening for UVP requirement, FFH compatibility assessment, species protection specialist report, water framework directive specialist report, and scoping. Assigned to fee zone 3 (high complexity due to protected areas and natural assets). Exact scope of optional and special services to be determined in negotiation phase.
- Lot 2: Ingenieurbauwerk (Engineering Structure)
Engineering design services covering HOAI service images for: buildings (§ 34 HOAI), outdoor facilities (§ 39 HOAI), engineering structures (§ 43 HOAI), traffic installations (§ 47 HOAI), structural planning (§ 51 HOAI), technical equipment (§ 55 HOAI), geotechnical services (Anlage 1.3 HOAI), and planning-accompanying surveying (Anlage 1.4 HOAI), plus miscellaneous special services. Some performance phases and special services offered optionally only. Final scope definition in negotiation phase. Client retains right to award optional services individually and phase-by-phase, and reserves right to commission additional special services per HOAI 2021 as needed. No automatic contract continuation to subsequent phases.
Key requirements
- Environmental planning (Los 1) and engineering design (Los 2) for pumping-station replacement
- Compliance with EU Water Framework Directive, German Climate Act (NKlimaG), and sustainable-procurement guidelines (VV-NB)
- Lifecycle-cost and climate-impact assessment including CO2 shadow pricing; DGNB-certified zero-emission construction site
- Fish-friendly pump technology, protection of surrounding conservation areas, modular construction, recycled/renewable materials
- Phased delivery: Phases 1–2 (pre-design) initially; Phases 3–4 (design & permitting) subject to funding approval; legal permit target 2029
Relevant sectors
How this compares
About this sector
About this sector
Environmental justice funding supports communities most exposed to pollution and climate harm, with an emphasis on local leadership. It is offered by public programmes and foundations, often as grants to community organisations and partnerships. Calls typically ask how residents are involved in decisions and how benefits stay in the community.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)