This tender closed on 8 June 2026. The deadline passed 170 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Engineering design services – SE-26-01 Engineering design services surface water for flood protection
Stor Elvdal kommune
- Value
- Not stated · check listing
- Closes
- 8 Jun 2026Closing date passed
- Where
- Norway
- Contract
- Services · Government
In context
This is a contract notice published by a government body covering services. Bids are invited through an open procedure. Delivery covers Norway (Europe). It is classified under Climate Adaptation and Water against the sustainability taxonomy rather than matched on keywords.
Summary
Stor-Elvdal municipality seeks detailed engineering design services for surface water management and flood protection infrastructure in Otta, Norway, with coordination requirements for future integration with national flood defence systems. The contract attracts engineering consultancies with expertise in hydraulic infrastructure, stormwater systems, and climate-adaptation engineering.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Stor Elvdal municipality intends to procure detailed engineering design services for surface water measures in the centre of Otta. The scope covers the design of municipal surface water pipelines intended to be completed and operational before NVE's main flood protection system is in place (anticipated start-up 2028/29). The strategy requires that the pipeline network be built with temporary outlets to the river, while being prepared for future connection to NVE's pump stations. Close interaction with NVE and their consultants is required to ensure the designed systems are feasible and compatible with the future flood protection infrastructure. Tenderers are expected to apply their expertise and competence to contribute to fulfilling the overall aim of the contract, which is to provide resilient surface water management in advance of the broader flood protection scheme.
Key requirements
- Detailed engineering design for surface water management systems in Otta town centre
- Design must accommodate temporary outlets to river with future connection capability to NVE pump stations
- Close coordination and feasibility assessment with NVE (Norwegian Water Resources and Energy Directorate) and their consultants
- Infrastructure planned for completion before main NVE flood protection system (2028/29) becomes operational
- Expertise in hydraulic engineering, stormwater pipeline design, and climate-adaptation infrastructure
Relevant sectors
How this compares
About this sector
About this sector
Climate adaptation funding helps communities, infrastructure and businesses prepare for heat, flooding, drought and sea level rise. Most of it is public and multilateral money, often targeted at vulnerable regions and delivered with local government. Calls usually ask for a climate risk assessment and evidence that local people shaped the plan.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)