This tender closed on 12 June 2026. The deadline passed 166 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Engineering design services – sludge management renovation Jihlava WWTP
Original: Engineering design services – Obnova kalového hospodářství na ČOV Jihlava - PD
Statutární město Jihlava
- Value
- Not stated · check listing
- Closes
- 12 Jun 2026Closing date passed
- Where
- Czech Republic
- Contract
- Services · Government
In context
This is a contract notice published by a government body covering services. Bids are invited through an open procedure. Delivery covers Czechia and the European Union (Europe). It is classified under Energy Efficiency, Water and Circular Economy against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures engineering design services for the renovation of sludge management infrastructure at Jihlava wastewater treatment plant, with emphasis on energy efficiency, modern technologies, and sustainable sludge handling. The successful bidder should be an engineering consultancy or design firm with expertise in wastewater treatment, sludge management, energy-efficient process optimization, and environmental compliance.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Předmětem plnění veřejné zakázky je poskytnutí služeb spočívající ve vypracování projektové dokumentace pro obnovu kalového hospodářství na ČOV Jihlava. Dokumentace bude vypracována v souladu s platnou i připravovanou legislativou, včetně všech souvisejících norem a nařízení, zejména v oblasti ochrany životního prostředí a nakládání s odpady. Součástí plnění je návrh řešení zaměřeného na snížení energetické náročnosti prostřednictvím efektivního využití moderních technologií a postupů, které minimalizují spotřebu energie při provozu kalového hospodářství. Dále bude optimalizován provoz ČOV Jihlava, a to zlepšením technologických procesů, zvýšením provozní efektivity a snížením nákladů na údržbu a provoz zařízení. Projektová dokumentace rovněž zahrne návrh efektivního řešení nakládání s kalovými produkty, přičemž budou zohledněny možnosti jejich dalšího využití nebo ekologické likvidace. Dokumentace bude zpracována s důrazem na udržitelnost a dlouhodobou funkčnost zařízení, přičemž budou zohledněny i budoucí možnosti rozvoje a modernizace ČOV Jihlava. Projektová dokumentace bude navržena tak, aby umožnila realizaci obnovy kalového hospodářství za nepřerušeného provozu ČOV. Podkladem pro její zpracování jsou technické parametry stanovené objednatelem a studie posouzení stavu ČOV Jihlava.
Key requirements
- Project documentation for sludge management system renovation at wastewater treatment plant
- Energy efficiency design reducing operational energy consumption through modern technologies
- Compliance with environmental legislation, waste management regulations, and EU/national standards
- Optimization of treatment processes, operational efficiency, and maintenance cost reduction
- Sustainable sludge product handling with reuse or ecological disposal solutions
- Design enabling renovation works without interrupting WWTP operations
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)