This tender closed on 30 June 2026. The deadline passed 148 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Engineering design services – stormwater drainage system development Törzs Street
Original: Engineering design services – NyMJV TOP_PLUSZ-132_00016 Tervezési szolgáltatások
Nyíregyháza Megyei Jogú Város Önkormányzata
- Value
- Not stated · check listing
- Closes
- 30 Jun 2026Closing date passed
- Where
- Hungary
- Contract
- Services · Government
In context
This is a contract notice published by a government body covering services. Delivery covers Hungary and the European Union (Europe). It is classified under Water, Climate Adaptation and Biodiversity and Nature against the sustainability taxonomy rather than matched on keywords.
Summary
Engineering design and planning services for a stormwater drainage system upgrade on Törzs Street in Nyíregyháza, Hungary, including permitting plans, construction drawings, and site supervision. Bidders should be engineering consultancies with expertise in water infrastructure, permitting processes, and green infrastructure design aligned with EU TOP Plusz programme requirements.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
This procurement concerns engineering design services for the project titled 'Development of a Stormwater Drainage System on Törzs Street' (project code: TOP_PLUSZ-1.3.2-23-NY1-2025-00016), located within the administrative territory of Nyíregyháza. The scope includes the preparation of a permitting design (Engedélyes terv) and an execution/construction design (Kiviteli terv), as well as designer site supervision services (5 occasions), and professional support for the public procurement procedures related to the associated construction works. The Municipality previously prepared a water rights construction permitting and execution plan for stormwater drainage on Törzs Street ('Existing Plan'), which provided for the installation of prefabricated reinforced concrete stormwater retention tanks at multiple locations to store excess precipitation during peak rainfall events. The Existing Plan holds a valid water rights construction permit. However, the Existing Plan was developed under the earlier 'TOP' grant scheme and is not eligible for use (accounting) under the current 'TOP Plusz' grant framework, making revision/further development of the plan necessary. The design task involves revising/redesigning the Existing Plan in accordance with a separately issued Substantiation Document extract and the first-round opinion of the Green Infrastructure Plan Jury, taking into account the conditions of the TOP Plusz grant specifications. This encompasses the preparation of a new, unified, and final permitting design and construction design, conducting the associated permitting procedures, and providing documentation necessary for the public procurement of construction works to be carried out based on the new plans. Key quantitative design data include: approximately 680 m of stormwater sewer channel with inspection chambers, connection pipes, and cross-connection pipes; stormwater retention system design at 5 locations; irrigation water offtake connected to 5 stormwater retention block systems; and design of approximately 400 m² of green surfaces with irrigation. Related tasks also include preparation of documentation on biological activity preservation. The detailed scope is specified in the Design Programme forming part of the Procurement Documents (KD).
Bidder eligibility
Not explicitly stated in the extracted text. Eligibility and qualification requirements are contained in the full Procurement Documents (Közbeszerzési Dokumentumok – KD). Typical Hungarian public procurement requirements would include registration as a legal entity, professional qualifications/licenses for engineering design services under Hungarian law, and compliance with TOP Plusz grant conditions.
How bids are scored
Not disclosed in the extracted text. Evaluation criteria are expected to be detailed in the full Procurement Documents.
Key requirements
- Redesign of existing stormwater drainage plan to comply with TOP Plusz funding requirements
- Preparation of unified permitting plan and construction drawings with associated regulatory approvals
- Design of stormwater storage system (5 locations with prefabricated concrete retention blocks) and ~680 m drainage channel with cleaning chambers and branch connections
- Environmental documentation including biological activity preservation and irrigation design for storage blocks
- Site supervision (5 site visits) and professional support for subsequent procurement of construction works
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)