Skip to content
Raise Lens
TENDERutilityservices

Engineering design services – Drinking Water Study, TA 2 Tender

••••• organisation

Summary

Engineering design services for an 11 km drinking water supply pipeline from Nauendorf to Zaschwitz in Germany, part of an energy-optimization programme for a regional water utility. Bidders should be engineering consultancies with experience in water infrastructure planning and pipeline design.

Summary by Raise Lens from the official notice · 28 Aug 2026Accurate?

Unlock the funder, link and full detail

Create a free account to unlock 3 full listings a month, including the funder name, the application link and the complete programme detail.

About this tender

Engineering design services for a drinking water supply pipeline project (Trinkwasser-Studie, TA 2) by the funder. The project involves planning and design of a drinking water supply line from the pressure boost station (DE) Nauendorf via Deutleben and Mücheln towards Zaschwitz to the municipal boundary of Wettin-Löbejün/Salzatal. This is a sub-project of the overall drinking water supply network optimization initiative aimed at energetic renovation of the network. …

CPV codes