Engineering services – Construction of a pipeline route in Bietigheim – planning services 2026 Tender
Original: Engineering services – Herstellung einer Leitungstrasse in Bietigheim - Planungsleistungen
Gemeindeverwaltung Bietigheim
In context
This is a contract notice published by a government body covering services. Delivery covers Germany (Europe). It is classified under Water against the sustainability taxonomy rather than matched on keywords.
The municipality of Bietigheim seeks engineering firms for HOAI phases 1–9 (planning through site supervision and property management) for a wastewater pipeline with pumping station, a redundant drinking water main, and conduits serving a new commercial development. Suited to engineering consultancies with German municipal water infrastructure and HOAI experience.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The Gemeinde Bietigheim plans to enable commercial development on about 62.5 ha south of the B3, between the existing Lidl site / former Bundeswehr equipment depot and the area towards Neumalsch. A key driver is the planned settlement of Amazon on a partial area of about 20 ha. The development requires new technical infrastructure for secure water supply and wastewater disposal. The infrastructure to be built comprises a foul-water sewer including a pumping station, a redundant drinking-water pipeline, and additional empty conduits (Leerrohre). The basic routing was already developed in a preliminary investigation, and the route is shown in an attached plan. This tender covers engineering services for HOAI Leistungsphasen 1 to 9. The scope includes coordination, permits, tendering and award, construction supervision, and property/object management after completion. The contract value for these engineering services is not stated in the notice. Timing depends on the Amazon settlement. The infrastructure should be completed with sufficient buffer before the planned connection or commissioning of the site, currently expected around mid to late 2029. The preliminary construction cost estimate (status June 2026) is about EUR 1,533,000 net for the sewer and pumping station including TA, about EUR 1,692,000 net for the drinking-water pipeline, and about EUR 286,000 net for the empty conduits. Together that is about EUR 3,511,000 net, or roughly USD 3.86 million at the stated conversion rate. These are construction cost estimates, not the engineering services fee, so they are not recorded as the contract budget.
Key requirements
- ✓Full HOAI service phases 1–9 for wastewater pumping station and pipeline
- ✓Redundant drinking water main and conduit planning, including authority approvals
- ✓Tendering, award, construction supervision and property management support by June 2029 timeline
CPV codes
Relevant sectors
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.