This tender closed on 29 September 2026. The deadline passed 57 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Engineering services – environmental planning for Krefeld-Uerdingen Rhine Bridge replacement
Original: Engineering services – VKE D171, B228, Ersatzneubau Krefeld-Uerdinger Rheinbrücke - Umweltplanerische Leistungen
DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH
- Value
- Not stated · check listing
- Closes
- 29 Sep 2026Closing date passed
- Where
- Germany
- Contract
- Consulting · Government
In context
This is a contract notice published by a government body covering consulting. Delivery covers Germany and the European Union (Europe). It is classified under Biodiversity and Nature, Water and Climate Adaptation against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures environmental planning services (UVP, LBP, ASB, FFH-VP, WRRL) for the replacement of the Krefeld-Uerdingen Rhine Bridge in Germany. Bidders must be specialized environmental consultancies with expertise in EIA, landscape ecology, species protection, and water-framework compliance.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Engineering services for environmental planning related to the replacement of the Krefeld-Uerdingen Rhine Bridge (Ersatzneubau Krefeld-Uerdinger Rheinbrücke), part of federal road B 288 connecting Duisburg and Krefeld. The bridge, originally constructed 1933–1936 and partially rebuilt post-WWII, is a heritage-listed structure carrying approximately 24,000 vehicles daily (15% heavy traffic). The project requires preparation of five independent environmental planning expert reports during pre-planning and design/approval phases: (1) Environmental Impact Assessment (UVP), (2) Landscape Management Plan (LBP), (3) Species Protection Contribution (ASB), (4) Habitats Directive Compatibility Assessment (FFH-VP), and (5) Water Framework Directive Technical Contribution (FB-WRRL). The new bridge will have a cross-section width of 16.10 m, with speed limits of 100 km/h on the Mündelheim approach and 70 km/h in Krefeld, while non-motorized traffic will be redirected via the existing bridge with ramp access beneath the dike relocation infrastructure.
Lots
- Lot 1: Umweltverträglichkeitsprüfung (UVP)
Environmental Impact Assessment
- Lot 2: Landschaftspflegerischer Begleitplan (LBP)
Landscape Management Plan
- Lot 3: Artenschutzbeitrag (ASB)
Species Protection Contribution
- Lot 4: FFH-Verträglichkeitsprüfung (FFH-VP)
Habitats Directive Compatibility Assessment
- Lot 5: Fachbeitrag zur Wasserrahmenrichtlinie (FB-WRRL)
Water Framework Directive Technical Contribution
Key requirements
- Environmental Impact Assessment (UVP) preparation
- Landscape management plan (LBP) and species protection assessment (ASB)
- Natura 2000 compatibility check (FFH-VP) and Water Framework Directive compliance (WRRL)
- Expertise in German environmental law and bridge infrastructure assessment
- Delivery of five independent environmental planning reports by 2026-09-29
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Biodiversity funding backs habitat restoration, species protection, protected areas and nature-positive business. It comes from environment agencies, multilateral nature funds and conservation philanthropy, often through competitive calls with defined regions. Applicants are usually asked for baseline surveys, local partners and indicators that show ecological change.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)