Skip to content
Raise Lens
Tender · TED (EU)

Engineering services for ATAC tram and trolleybus infrastructure maintenance

Original: Engineering services – Servizi di architettura e ingegneria ed altri servizi tecnici accessori relativi ai lavori di manutenzione delle infrastrutture della rete tranviaria e filoviaria di ATAC S.p.A._ Procedura di gara aperta finalizzata all'affidamento di un Accordo Quadro con un solo operatore economico, della durata di 48 mesi decorrenti dalla sottoscrizione, ai sensi e per gli effetti di cui agli artt. 71, 141, 149

ATAC - Lavori e Affidamenti

Value
Not stated · check listing
Closes
15 Dec 2026
 
Where
Italy
Contract
Services · Soe

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 34 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 11 Nov 202634 days to prepare
Found today · 24 Nov 202621 days to prepare

In context

This is a contract notice published by a state-owned enterprise covering services. Bids are invited through an open procedure. Delivery covers Italy (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

Rome's public transport operator ATAC is seeking a single operator under a 48-month framework agreement for architecture and engineering design and related technical services for maintaining its tram and trolleybus network infrastructure. Suited to an established engineering consultancy with rail or tram infrastructure experience, not an early-stage climate company.

Summary by Raise Lens from the official notice · 18 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

ATAC S.p.A., the Rome public transport operator, is procuring architecture and engineering services and other ancillary technical services for maintenance works on the tram and trolleybus network infrastructure. The procedure is an open tender to award a framework agreement (Accordo Quadro) with a single economic operator. The framework runs for 48 months from signing. The notice cites articles 71, 141, 149, 153 and 154 of Legislative Decree 36/2023, as amended by Legislative Decree 209/2024. The page text consists only of the notice title, so the detailed deliverables, work packages, and volumes are not available in the extracted content.

Key requirements

  • Single-operator framework agreement lasting 48 months from signature
  • Architecture and engineering design and accessory technical services for tram and trolleybus infrastructure maintenance
  • Open procedure under Italian Procurement Code D.lgs. 36/2023 (arts. 71, 141, 149, 153-154)

CPV codes

Relevant sectors

Infrastructure

How this compares

About this sector

Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published11 Nov 2026
Closes15 Dec 2026, 00:00 UTC
Buyer typeSoe
TypeServices
MethodOpen
CountryItaly
RegionEurope
CurrencyEUR
Last verified18 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)