Engineering services – Schwarze Pumpe industrial park: wastewater outlet 1 modernisation planning 2026 Tender

Original: Engineering services – Industriepark Schwarze Pumpe; Modernisierung eines Teilabschnittes des Ableiters 1 der Abwasserbehandlungsanlage I (ABA I); Planungsleistungen LP 1-9

Zweckverband Industriepark Schwarze Pumpe (ZV ISP) vertreten durch die ASG Spremberg GmbH als Treuhänder

In context

This is a contract notice published by a government body covering consulting. Delivery covers Germany (Europe). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

The Zweckverband Industriepark Schwarze Pumpe seeks engineering planning services (HOAI LP 1-9) to modernise a section of wastewater outlet 1 at its treatment plant, covering materials, pipe sizing, construction phasing, bypass pumping, permits and a funding application. Engineering consultancies with wastewater and sewer design experience, likely SME-scale, fit this consulting scope.

Summary by Raise Lens from the official notice · 2 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The Zweckverband Industriepark Schwarze Pumpe (ZV ISP), represented by ASG Spremberg GmbH as trustee, is procuring engineering planning services for the modernisation of a section of Ableiter 1 (outlet channel 1) at the Abwasserbehandlungsanlage I (ABA I) wastewater treatment plant in the Industriepark Schwarze Pumpe. The services cover HOAI planning phases LP 1 to 9. The full route from the ABA I outlet shaft to R1.2 is to be modernised. The section between AW1 and AW2 was built over after the original construction and is a special case, so a lateral realignment of the route to the east or west must be examined. The core deliverables include review of existing records and documentation; a modernisation concept with a hydraulic verification for a design flow of 300 to 350 m³/h under free-surface flow, including options for a coating to ease cleaning; modernisation of the shafts while keeping the existing pipe lengths; and material selection. Material selection must account for the chemical properties of the wastewater, increasing scaling potential, cleaning by high-pressure or acid flushing, and optimisation of the cleaning regime. A cost estimate with a variant comparison across materials (concrete, steel, etc.) with and without coating is also required. Further deliverables include division of the work into construction phases that respect operational usage windows, temporary structures and mobile pump stations to divert wastewater during construction, and a realisation timeline that follows operator requirements. The provider must also prepare permit documentation, coordinate with third parties, and produce a complete funding application package (LP 4). Preparation of the funding application must clarify demand justification, site suitability and usability of the property, concept alignment with the preliminary design, economic efficiency and variant analysis, and cost determination. The expected duration is not stated in the extracted text; it is presumably tied to the LP 1 to 9 phase structure and the construction timeline.

Key requirements

  • ✓Planning services for wastewater channel modernisation, HOAI phases LP 1-9, including hydraulic verification at 300-350 m³/h
  • ✓Material and coating variant comparison with cost estimate, plus phased construction and temporary bypass pumping concepts
  • ✓Permitting documents and a complete funding application (LP 4) including need, site and economic assessments

Relevant sectors

Water tendersInfrastructure

How this compares

  • Compared with 1240 similar tenders (water in Germany) listed in the last 12 months.
  • Similar tenders that state a value range from $51k to $23m, with a median of $1.3m (89 tenders).
  • It allows 29 days to respond, shorter than the typical 30 days across 810 similar tenders.
  • The same organisation listed 2 other similar tenders here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.