This tender closed on 12 October 2026. The deadline passed 45 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
- Riverbank protection works – Repair of reclamation works damaged by June 2024 storms
- Construction work for water projects – Gara multilotto_ALBEROBELLO_CERIGNOLA
- Electronic, electromechanical and electrotechnical supplies – Routine and extraordinary maintenance service and spare parts supply for the overhead traveling crane at the Milano Nosedo wastewater treatment plant
Engineering services – safety direction and coordination for hydrogeological risk mitigation works, BIM applied
Original: Engineering services – Affidamento dei servizi tecnici di direzione e coordinamento della sicurezza in fase di esecuzione dei Lavori per la mitigazione del rischio idrogeologico e la messa in sicurezza e sistemazione idrogeologica della zona Baccarizzi - Bartoli - Nuova Pagliaia con applicazione della metodologia BIM
CUC del Lago di Occhito
- Value
- Not stated · check listing
- Closes
- 12 Oct 2026Closing date passed
- Where
- Italy
- Contract
- Services · Government
In context
This is a contract notice published by a government body covering services. Delivery covers Italy (Europe). It is classified under Climate Adaptation and Water against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures engineering services for safety coordination and direction during hydrogeological risk mitigation and stabilization works in an Italian region, using BIM methodology. Bidders should be qualified civil/hydrogeological engineers with safety management and BIM expertise.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Affidamento dei servizi tecnici di direzione e coordinamento della sicurezza in fase di esecuzione dei Lavori per la mitigazione del rischio idrogeologico e la messa in sicurezza e sistemazione idrogeologica della zona Baccarizzi - Bartoli - Nuova Pagliaia con applicazione della metodologia BIM
Key requirements
- Technical direction and safety coordination during execution phase of hydrogeological mitigation works
- BIM (Building Information Modeling) methodology application and expertise
- Hydrogeological risk assessment and stabilization systematics for Baccarizzi-Bartoli-Nuova Pagliaia zone
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Climate adaptation funding helps communities, infrastructure and businesses prepare for heat, flooding, drought and sea level rise. Most of it is public and multilateral money, often targeted at vulnerable regions and delivered with local government. Calls usually ask for a climate risk assessment and evidence that local people shaped the plan.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)