This tender closed on 9 September 2026. The deadline passed 77 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Engineering services – Tallinn point-based lighting control system procurement and installation
Original: Engineering services – Tallinna valgustuspunktipõhise juhtimissüsteemi soetamine ja paigaldus
Tallinna Keskkonna- ja Kommunaalamet
- Value
- Not stated · check listing
- Closes
- 9 Sep 2026Closing date passed
- Where
- Estonia
- Contract
- Mixed · Government
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Bids are invited through an open procedure. Delivery covers Estonia (Europe). It is classified under Energy Efficiency and Grid Modernisation against the sustainability taxonomy rather than matched on keywords.
Summary
Tallinn is procuring engineering services to design, supply, install, and manage a point-based street lighting control system with software configuration, maintenance, and training. Bidders should have expertise in lighting control systems design, electrical installation, and IoT/SCADA platform management.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Engineering services for procurement and installation of Tallinn's point-based lighting control system. Scope includes: system design/engineering, supply and storage of control components, assembly and replacement of control panels, installation of control components (construction), and control software-related work including configuration, management, maintenance, user support and training. Detailed description and conditions are provided in the tender base documents.
Bidder eligibility
Exclusion grounds and qualification conditions specified in tender base documents (not detailed in this notice excerpt).
Key requirements
- System design and engineering for point-based lighting control
- Supply, storage, and assembly of control components and panels
- Installation, configuration, and commissioning of control hardware and software
- Ongoing management, maintenance, user support, and staff training
Relevant sectors
How this compares
About this sector
About this sector
Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)