This tender closed on 21 August 2026. The deadline passed 97 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Engineering services – Umrollung Piste 28; Planer Umweltmassnahmen
Flughafen Zürich AG - Tiefbau
- Value
- Not stated · check listing
- Closes
- 21 Aug 2026Closing date passed
- Where
- Switzerland
- Contract
- Consulting · Corporate
In context
This is a contract notice published by a corporate buyer covering consulting. Delivery covers Switzerland (Europe). It is classified under Climate Adaptation, Air Quality and Biodiversity and Nature against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures environmental planning and coordination services for runway 28 reconstruction at Zurich Airport, including implementation of environmental impact mitigation measures, specialist procurement, and construction-phase environmental management. Bidders should be engineering consultancies with environmental planning expertise, aviation infrastructure experience, and Swiss regulatory knowledge.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Engineering services mandate for environmental measures implementation related to the "Umrollung Piste 28" (Runway 28 Reengineering) project at Zurich Airport. The scope includes implementing environmental measures described in the Environmental Impact Assessment (UVB) and fulfilling conditions from the planning approval decree (PGV). The mandate encompasses addressing open environmental-related points, updating and revising existing documentation as necessary, coordinating with specialist planners across various technical disciplines, consolidating relevant information in required reports, concepts and plans, preparing cost estimates (KV) in environmental-relevant areas, and conducting procurement for executing contractors. The successful bidder will serve as the central environmental coordination point responsible for overall environmental theme management and specialist planner coordination throughout the project duration.
Key requirements
- Implementation of environmental impact assessment (UVB) mitigation measures for runway 28 reconstruction
- Coordination of multiple environmental specialist planners and consolidation of environmental themes across project phases
- Preparation of environmental reports, concepts, plans, and construction-phase environmental management (KV) documentation
- Liaison with planning approval authorities and compliance with planning permission conditions (PGV)
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Climate adaptation funding helps communities, infrastructure and businesses prepare for heat, flooding, drought and sea level rise. Most of it is public and multilateral money, often targeted at vulnerable regions and delivered with local government. Calls usually ask for a climate risk assessment and evidence that local people shaped the plan.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)