This tender closed on 1 October 2026. The deadline passed 55 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Environmental engineering consultancy – drinking water quality recovery interconnection project
Original: Environmental engineering consultancy services – Etude de faisabilité, modification du schéma directeur de l'alimentation en eau potable et mission de maîtrise d'oeuvre dans le cadre de la mise en oeuvre de la reconquête de la qualité de l'eau potable sur le secteur de l'interconnexion Terminiers - Loigny-la-Bataille (28140)
Communauté de Communes Coeur de Beauce
- Value
- Not stated · check listing
- Closes
- 1 Oct 2026Closing date passed
- Where
- France
- Contract
- Consulting · Government
In context
This is a contract notice published by a government body covering consulting. Delivery covers France and the European Union (Europe). It is classified under Environmental Justice, Water and Climate Adaptation against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures environmental engineering consultancy for drinking water quality recovery, including feasibility study, water supply master plan modification, and engineering supervision for an interconnection project in France. Bidders should be specialized water infrastructure consultancies or environmental engineering firms with experience in potable water systems and regulatory compliance.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Environmental engineering consultancy services for drinking water quality recovery on the Terminiers - Loigny-la-Bataille interconnection sector (28140). The scope includes: (1) a feasibility study (étude de faisabilité); (2) modification of the master drinking water supply scheme (schéma directeur de l'alimentation en eau potable); and (3) project management services (mission de maîtrise d'œuvre) for implementing drinking water quality recovery measures. The project is managed by Communauté de Communes Coeur de Beauce.
Key requirements
- Feasibility study for water quality restoration
- Modification of drinking water supply master plan (schéma directeur)
- Engineering supervision (maîtrise d'œuvre) for interconnection infrastructure between Terminiers and Loigny-la-Bataille
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Environmental justice funding supports communities most exposed to pollution and climate harm, with an emphasis on local leadership. It is offered by public programmes and foundations, often as grants to community organisations and partnerships. Calls typically ask how residents are involved in decisions and how benefits stay in the community.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)