This tender closed on 25 June 2026. The deadline passed 153 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Environmental monitoring post-construction water infrastructure southwestern Sicily
Original: Environmental monitoring for construction – servizio di monitoraggio ambientale, post operam, sulle componenti: atmosfera, acque superficiali, acque sotterranee, suolo, ecosistema e stato fisico dei luoghi, nell’ambito dei lavori per la realizzazione degli "interventi per il potenziamento del sistema idrico della Sicilia sud-occidentale - adduzione da Montescuro Ovest per Mazara, Petrosino e Marsala"
Siciliacque S.p.A.
- Value
- Not stated · check listing
- Closes
- 25 Jun 2026Closing date passed
- Where
- Italy
- Contract
- Services · Utility
In context
This is a contract notice published by a utility covering services. Delivery covers Italy and the European Union (Europe). It is classified under Environmental Justice, Water and Biodiversity and Nature and 2 others against the sustainability taxonomy rather than matched on keywords.
Summary
Post-construction environmental monitoring service covering atmosphere, surface water, groundwater, soil, ecosystem, and site conditions for a water infrastructure project in southwestern Sicily. Bidders must have expertise in multi-component environmental assessment and monitoring protocols.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
This tender, issued by Siciliacque S.p.A., concerns the procurement of environmental monitoring services (servizio di monitoraggio ambientale) in the post-operam phase for a water infrastructure project in south-western Sicily, Italy. The scope covers monitoring of multiple environmental components: atmosphere (aria/atmosfera), surface waters (acque superficiali), groundwater (acque sotterranee), soil (suolo), ecosystems (ecosistema), and the physical state of the territory (stato fisico dei luoghi). The monitoring is required in connection with construction works for the enhancement of the water supply system of south-western Sicily ('interventi per il potenziamento del sistema idrico della Sicilia sud-occidentale'), specifically relating to the water conveyance infrastructure from Montescuro Ovest serving the municipalities of Mazara del Vallo, Petrosino, and Marsala. The post-operam phase implies that monitoring activities will commence during or following the conclusion of construction works, tracking environmental recovery and any residual impacts across the defined components. Deliverables are expected to include periodic environmental monitoring reports, field sampling campaigns, laboratory analyses, and data submission to the contracting authority and relevant regulatory bodies in accordance with applicable Italian and EU environmental legislation.
Bidder eligibility
Specific eligibility criteria are not fully detailed in the extracted page content. As a utility-sector procurement under Italian and EU regulations, bidders would typically be required to demonstrate: legal standing and absence of exclusion grounds under Italian Legislative Decree 36/2023 (or equivalent); relevant professional and technical capacity in environmental monitoring services; accredited laboratory facilities or access thereto for the required analyses (atmosphere, water, soil, ecosystems); appropriate environmental and professional certifications; and sufficient economic and financial standing. Specific references, minimum turnover thresholds, and technical experience requirements would be set out in the full tender documentation.
How bids are scored
Evaluation criteria are not disclosed in the available page content. For services of this nature under Italian public procurement rules, a quality-price ratio (offerta economicamente più vantaggiosa) approach would typically apply, with weightings assigned to technical quality (e.g., methodology, team qualifications, monitoring plan) and price. Specific weightings and scoring matrices would be contained in the full tender documents.
Key requirements
- Multi-component environmental monitoring (atmosphere, surface/groundwater, soil, ecosystem, physical site conditions)
- Post-construction (post operam) assessment and compliance verification
- Expertise in water infrastructure environmental impact assessment and monitoring protocols
Relevant sectors
How this compares
About this sector
About this sector
Environmental justice funding supports communities most exposed to pollution and climate harm, with an emphasis on local leadership. It is offered by public programmes and foundations, often as grants to community organisations and partnerships. Calls typically ask how residents are involved in decisions and how benefits stay in the community.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)