Execution of 725 kW solar PV self-consumption installation at Segovia hospital 2026 Tender
Original: Ejecución de una instalación solar fotovoltaica para autoconsumo de 725 kW (744,7 kWp) en el Hospital General de Segovia, según proyecto aprobado. Financiado con fondos FEDER 21-27.
Ente Regional de la Energía de Castilla y León
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Spain and the European Union (Europe). It is classified under Renewable Energy against the sustainability taxonomy rather than matched on keywords.
The tender procures execution of a 725 kW (744.7 kWp) on-site solar photovoltaic self-consumption installation at Hospital General de Segovia, built to an approved project and co-funded by FEDER 2021-27. A local or regional solar EPC contractor with PV installation experience and SME capacity is the natural fit.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Execution of a 725 kW (744.7 kWp) solar photovoltaic self-consumption installation at the Hospital General de Segovia, in accordance with the approved project. The works are co-financed by the European Regional Development Fund (FEDER) 2021-2027 programme. The contract type is Works (Obras), under CPV 45300000 (building installation works). Place of execution is Segovia, Spain. The procedure is open, processed as ordinary, with electronic submission of offers. The tender file (A2026/009414) was published on 21/10/2026. Published documents include the tender notice, specifications (pliego), the justification memo, the approval document, an Excel budget, a BC3 budget file, the composition of the tender board, and a site-visit attendance accreditation form. The page does not state the expected duration of the works.
Key requirements
- ✓Build 725 kW (744.7 kWp) solar PV self-consumption plant per approved project
- ✓Installation located at Hospital General de Segovia, Castilla y León
- ✓Funded by FEDER 2021-27; EU co-funding compliance and reporting likely required
CPV codes
Relevant sectors
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →