External insulation works – George Sand college, La Châtre, lot 3
Original: Roof works and other special trade construction works – Travaux Décret tertiaire - Demi-Pension - Couvertures au collège George Sand de La Châtre - Relance du lot n° 3 : Isolation extérieure
Département de L'Indre
- Value
- Not stated · check listing
- Closes
- Not stated · check listing
- Where
- France
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Delivery covers France and the European Union (Europe). It is classified under Energy Efficiency and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Procurement of external wall insulation, window frames, and vertical cladding works (828m² insulation, 298 window frames, 136m² cladding) at a secondary school in France as part of tertiary-sector energy-efficiency compliance. Bidders must be specialized roofing and external envelope contractors with experience in building-envelope retrofit and thermal insulation.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Roof works and special trade construction works for Collège George Sand de La Châtre. Lot 3 concerns exterior insulation works decomposed into three phases: TF (building D), TO1 (buildings A and B), and TO2 (building C). Scope includes 828m² of exterior insulation, 298 window/door frame units, and 136m² of vertical timber cladding. Project is part of tertiary sector energy regulation compliance (Décret tertiaire) and half-boarding facility improvements.
Lots
- Lot 3-TF: Isolation extérieure - Building D
Exterior insulation works for building D
- Lot 3-TO1: Isolation extérieure - Buildings A and B
Exterior insulation works for buildings A and B
- Lot 3-TO2: Isolation extérieure - Building C
Exterior insulation works for building C, including 828m² exterior insulation, 298 window/door frames, 136m² vertical timber cladding
Key requirements
- 828m² external wall insulation installation
- 298 window/door frame encasements
- 136m² vertical clear-gap cladding
- Compliance with tertiary-sector energy-efficiency decree (Décret tertiaire)
- Work split across three tranches (buildings A, B, C, D)
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)