Facade thermal insulation, Student Dormitory Block 59, Technical University Sofia
Original: Construction work – Топлоизолиране на фасадни стени на Студентско общежитие блок № 59, вх. А, Б, В, Г на Технически университет – София
ТЕХНИЧЕСКИ УНИВЕРСИТЕТ
- Value
- Not stated · check listing
- Closes
- 23 Dec 2026
- Where
- Bulgaria
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 26 Nov. This page is open to everyone now.
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Bulgaria (Europe). It is classified under Heating and Cooling, Energy Efficiency and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Bulgarian public works tender for external thermal insulation (EPS and XPS systems), render, and related facade repairs on Student Dormitory Block 59 at the Technical University of Sofia, while the building stays occupied. It suits Bulgarian construction contractors with facade insulation experience and the capacity to work on an occupied building.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Construction works for thermal insulation of the external facade walls of Student Dormitory Block No. 59, entrances A, B, V and G, owned by the Technical University of Sofia. The building is in continuous occupation, and the work is classified as a third-category construction project under Bulgarian construction regulations. Scope includes plaster removal and repair; scaffolding erection and dismantling (15,300 m²); EPS 120 mm facade insulation (λ ≤ 0.035 W/m²K, 9,949 m²); XPS 120 mm plinth insulation (522 m²); PVC-mesh reinforced rendering; fire-barrier strips of Class A1/A2 insulation; mineral and mosaic plaster finishes; window reveal insulation and plastering; roof edge flashing and drip edges; replacement of aluminium window sills; lightning protection installation; ventilation grille replacement; demolition and replacement of terrace tiling, screed, waterproofing and granite tiles; replacement of terrace drains; replacement of expansion joints; installation of logos per the Contracting Authority's design; and waste removal to a licensed landfill. The maximum execution period for all activities is 270 calendar days from the date the contract is registered in the Contracting Authority's records system. Warranty periods for the construction and installation works follow Bulgarian Ordinance No. 2 (2003) on commissioning buildings and minimum warranty periods. Warranty periods start from the date a bilateral protocol confirming the completed works is signed. The notice does not disclose a contract value, lot structure or bidder eligibility requirements in the extracted text.
Key requirements
- Supply and install EPS 120 mm (λ ≤ 0.035) and XPS 120 mm plinth thermal insulation systems with render and PVC mesh
- Scaffolding, facade repairs, window reveal insulation, and waste removal to licensed disposal site
- Works performed on a continuously occupied student residence (third-category construction)
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)