This tender closed on 3 August 2026. The deadline passed 114 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Filtering apparatus – Process gas drying technology with SO2 content
Original: Filtering apparatus – Technologie sušení procesního plynu s obsahem SO2
Enaspol a.s.
- Value
- Not stated · check listing
- Closes
- 3 Aug 2026Closing date passed
- Where
- Czech Republic
- Contract
- Supplies · Corporate
In context
This is a contract notice published by a corporate buyer covering the supply of goods. Delivery covers Czechia and the European Union (Europe). It is classified under Heating and Cooling, Industrial Decarbonisation and Air Quality against the sustainability taxonomy rather than matched on keywords.
Summary
Procurement of a two-stage gas drying technology system for removing moisture and SO2 from process gas using condensation and sulfuric-acid absorption. Bidders should be equipment manufacturers or engineering firms with expertise in gas treatment, thermal separation, and chemical absorption systems.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
The contract concerns the design, manufacture, supply, and delivery of technology for drying wet process gas containing sulfur dioxide. The technology is based on a two-stage moisture removal process. In the first stage, process gas is cooled in a condensation section to condense a substantial portion of contained water. In the second stage, remaining moisture is removed by absorption drying in a packed drying tower, where gas flows countercurrent against circulating concentrated sulfuric acid. Sulfuric acid ensures absorption of water vapor from the gas. Acid concentration is maintained by supplementing 98% sulfuric acid and withdrawing sulfuric acid at target concentration of 96.5 wt%, diluted by water absorbed from process gas. The technology will be delivered as two pre-assembled skid units: condensation skid and drying tower skid. Delivery includes technological equipment, piping, fittings, instrumentation, support structures, cabling, and electrical connections within the scope of skid units, technical documentation, and expert support during commissioning.
Key requirements
- Design, manufacture, and delivery of two pre-assembled skid units (condensation and drying tower)
- Two-stage moisture removal: condensation stage plus sulfuric-acid absorption drying tower
- Complete piping, instrumentation, electrical integration, structural supports, and technical documentation
- On-site commissioning support and expert assistance during startup
How this compares
About this sector
About this sector
Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)