Flood Response Construct/ Removal of Dike Closures - Vicinity of Winnipeg, MB
Manitoba Transportation and Infrastructure - Tendering and Contracts
- Value
- Not stated · check listing
- Closes
- 15 Dec 2026
- Where
- Canada
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 1 Dec. This page is open to everyone now.
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Canada (NORTH-AMERICA). It is classified under Climate Adaptation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Manitoba Transportation and Infrastructure is procuring flood-fighting services under unit-price contracts, mainly constructing and removing clay dike closures at Floodway and West Dike openings near Winnipeg to Brunkild, with a spring binding contract and a non-binding summer/fall call-out list. Local contractors with hydraulic excavators, trucks, borrow-material hauling and traffic management capacity fit best.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Manitoba Transportation and Infrastructure is procuring flood response services under Non-Bonded Tender RF-97-207, part of the Province's flood fighting efforts. The work mainly consists of constructing and removing clay closures at the openings of the permanent flood protection Floodway and West Dike in the vicinity of Winnipeg to Brunkild, MB, should they be required. The tender has two purposes: (1) establish a binding unit-price contract with the low bidder for flood response during a SPRING flood event in the communities identified in the contract, and (2) establish a non-binding call-out list of unit prices for all qualified bidders for possible SUMMER and/or FALL flood events. The contractor must provide specified equipment and perform tasks as directed, including preparing, excavating, loading, hauling and placing borrow material; dike repair, maintenance and emergent work; removal of placed borrow material with site clean-up, repair and remediation; and traffic management. Quantities are not guaranteed and the scale, timing and extent of work are largely unknown. If dike closures are not required, equipment will not be mobilized and no payment will be made. The estimated contract period is 0 months, with a proposed start date of 2026/12/29. Manitoba will seek to keep highway commerce routes open as far as possible without compromising closure safety. A community drawing showing possible closure locations and borrow areas is appended to the tender. The equipment schedule covers hydraulic excavators (Groups 9 and 10, 8 hours each), crawler tractors (Groups 5 and 6, 8 hours each), skid steer and rubber-tire loaders (4 hours each), motor graders and padfoot packers (2 hours each), farm tractors (2 hours each per code), end-dump trucks (32 hours) and semi end-dump trailers (16 hours), plus traffic control flag persons and labourers (2 hours each).
Bidder eligibility
The page refers to 'qualified bidders' for the non-binding call-out list but does not set out specific eligibility criteria. Detailed requirements are said to be in the Reference Documents, which are not included on this page. Bidders may need a MERX account to view and bid, and the CanadaBuys support note suggests SAP Ariba registration may be required for government procurement.
How bids are scored
Not disclosed on the page. The binding contract is to be awarded to the 'low Bidder' on unit prices, which implies lowest-price selection for that contract. No price/quality split or scoring weights are given. The call-out list is for 'all qualified bidders', and the qualification standard is not stated.
Key requirements
- Provide hydraulic excavators (Group 9 and Group 10, twist bucket) and other specified equipment on call-out
- Prepare, excavate, load, haul and place borrow material for dike closures
- Removal of placed borrow material, site clean-up, repair and remediation
- Traffic management during closure works
- No guaranteed quantities; equipment mobilised only if closures are required, with payment on unit prices
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Climate adaptation funding helps communities, infrastructure and businesses prepare for heat, flooding, drought and sea level rise. Most of it is public and multilateral money, often targeted at vulnerable regions and delivered with local government. Calls usually ask for a climate risk assessment and evidence that local people shaped the plan.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)