Flood Response Construct/ Removal of Dike Closures - Vicinity of St. Adolphe, MB
Manitoba Transportation and Infrastructure - Tendering and Contracts
- Value
- Not stated · check listing
- Closes
- 4 Dec 2026
- Where
- Canada
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 27 Nov. This page is open to everyone now.
In context
This is a contract notice published by a government body covering construction and works. Bids are invited through an open procedure. Delivery covers Canada (NORTH-AMERICA). It is classified under Climate Adaptation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Manitoba Transportation and Infrastructure is procuring equipment-based flood response under unit-price contracts, including construction and removal of clay closures at St. Adolphe's permanent dike openings during spring floods, with a non-binding call-out list for summer and fall events. It fits contractors with excavators, haulage trucks, and traffic management capability who can mobilise quickly for flood fighting.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Manitoba Transportation and Infrastructure is procuring flood response work for the vicinity of St. Adolphe, MB under solicitation RF-97-200. The tender has two purposes: it establishes a binding unit-price contract with the low bidder for flood response during a spring flood event, and it creates a non-binding call-out list of qualified bidders for possible summer and/or fall flood events in the same communities. The work is part of the Province's flood fighting efforts and mainly consists of constructing and removing clay closures at the openings of the permanent flood protection dikes around St. Adolphe, should they be required. The contractor must provide specified equipment and carry out tasks as directed, including preparing, excavating, loading, hauling and placing borrow material; dike repair, maintenance and emergent work; removal of placed borrow material with site clean-up, repair and remediation; and traffic management. Quantities are not guaranteed. The exact scale, timing and extent of work depend on flood events. If dike closures are not required, equipment will not be mobilized and no payment will be made. The estimated contract period is 0 months, with a proposed start date of 18 December 2026. The equipment schedule lists 8 hours each of Group 9 and Group 10 hydraulic excavators with twist buckets, Group 10, 6, and 5 crawler tractors, and a Group 5 track loader with ripper. It also lists 2 hours each of Group 5 skid steer, Group 4 rubber-tire loader, Group 4 motor grader, Group 4 padfoot packer, and Group 3 farm tractor with disc, harrows and seeder. It further lists 10 hours of Group 3 wheel farm tractors, 48 hours of tandem-axle end-dump trucks (minimum 7 cu. m box), and 2 hours each of traffic control flag persons and labourers. The full scope is in reference documents available on MERX, and a drawing of the community showing possible closure locations and borrow areas is appended.
Bidder eligibility
The page does not state specific bidder eligibility requirements, registrations, classifications, references, or financial thresholds. It refers only to 'qualified bidders' for the non-binding call-out list. Full requirements are expected in the tender documents on the third-party MERX site.
How bids are scored
Not disclosed on the page. The tender is a competitive open bidding process, and the binding contract is awarded to the low bidder based on unit prices. No price/quality split or weightings are stated.
Key requirements
- Provide specified excavators, trucks and equipment on call, mobilised only when dike closures are directed
- Prepare, excavate, haul and place clay borrow material, and remove it and remediate sites after flood events
- Provide traffic management and dike repair or emergency works as directed by Manitoba, with no guaranteed quantities
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Climate adaptation funding helps communities, infrastructure and businesses prepare for heat, flooding, drought and sea level rise. Most of it is public and multilateral money, often targeted at vulnerable regions and delivered with local government. Calls usually ask for a climate risk assessment and evidence that local people shaped the plan.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)