This tender closed on 7 July 2026. The deadline passed 142 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Fuels – Electricity and Natural Gas Supply 2027-2028
Original: Fuels – Strom- und Erdgaslieferung 2027-2028
Kreis Viersen
- Value
- Not stated · check listing
- Closes
- 7 Jul 2026Closing date passed
- Where
- Germany
- Contract
- Supplies · Government
In context
This is a contract notice published by a government body covering the supply of goods. Bids are invited through an open procedure. Delivery covers Germany and the European Union (Europe). It is classified under Renewable Energy, Grid Modernisation and Energy Efficiency against the sustainability taxonomy rather than matched on keywords.
Summary
Kreis Viersen is procuring electricity and natural gas supply for 2027–2028, including grid balancing and integration of on-site renewable generation. Energy suppliers with capacity to manage RLM/SLP metering, balancing services, and distributed generation feed-in are the target bidders.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
The tender covers the supply of electrical energy (Lot 1) and natural gas for the Kreis Viersen district administration for the period 2027–2028. The electricity supply is structured as a formula-based procurement covering both RLM (Registrierende Leistungsmessung – metered load) and SLP (Standardlastprofil – standard load profile) installations. The supplier is responsible for balancing energy (Regelenergie). Additionally, surplus quantities from the district's own generation assets must be routed through the electricity balancing group model to specific facilities of Kreis Viersen. Natural gas supply is referenced in the title but not further detailed in the available text.
Lots
- Lot 1: Stromlieferung (Electricity Supply)
Formula-based procurement of electrical energy for RLM and SLP installations. Supplier assumes responsibility for balancing energy. Surplus quantities from own generation assets must be routed through the electricity balancing group model to designated Kreis Viersen facilities.
Key requirements
- Formula-based procurement for RLM and SLP installations
- Balancing energy (Regelenergie) provision by supplier
- Integration and pass-through of surplus generation from on-site renewable plants into district balance-group model
- Supply period 2027–2028
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)