Gas supply mains construction work – intelligent natural gas distribution network Horezu Valcea 2026 Tender
Original: Gas supply mains construction work – INFIINTARE RETEA INTELIGENTA DE DISTRIBUTIE GAZE NATURALE IN ORAS HOREZU JUDETUL VALCEA”
ORASUL HOREZU - CONSILIUL LOCAL HOREZU
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Bids are invited through an open procedure. Delivery covers Romania and the European Union (Europe). It is classified under Heating and Cooling against the sustainability taxonomy rather than matched on keywords.
This tender procures design, technical assistance, and construction services for a smart natural-gas distribution network in Horezu, Romania. Bidders should be engineering/construction firms with experience in gas infrastructure, project management, and technical verification capabilities.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The buyer, Orasul Horezu (Horezu Local Council), is procuring a combined package for the design, construction and related technical services for an intelligent natural gas distribution network in the town of Horezu, Vâlcea County, Romania. The project title is "Infiintare retea inteligenta de distributie gaze naturale in oras Horezu, judetul Valcea". The procurement covers three components. (a) Design services, including the documentation needed for approvals, agreements and permits (DTAC), the technical project and execution details. This component also includes technical verification of the technical project and execution details, which the design contractor must arrange through accredited project verifiers independent of the design team. (b) Technical assistance from the designer. (c) Execution of construction works. Excluded from this procurement are site supervision (dirigentie de santier, chapter 3.8.2 of the General Estimate) and health and safety coordination during execution (chapter 3.8.3 of the General Estimate). The buyer will procure these separately to keep supervision independent of the contractor. The stated end purpose of the services and works is implementation of the project. The notice excerpt does not state the contract duration, delivery milestones or performance period.
Key requirements
- ✓Design services including permits, technical design, execution details, and independent quality verification by certified verifiers
- ✓Technical assistance from designer during execution phase
- ✓Construction/execution of smart gas distribution network infrastructure
- ✓Exclusions: site management and health & safety coordination (procured separately by authority)
Relevant sectors
About this sector
Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →