Gesamtleitung Mittelfristmassnahmen, Thunstrasse West/Ost 2027 Tender

Fachstelle Beschaffungswesen Stadt Bern

Value
Not stated · check listing
Closes
5 Jan 2027
 
Where
Switzerland
Contract
Services · Government

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 62 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 4 Nov 202662 days to prepare
Found today · 24 Nov 202642 days to prepare

In context

This is a contract notice published by a government body covering services. Delivery covers Switzerland (CH-BE). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

The City of Bern seeks a general project lead (Gesamtleitung) under SIA phases 32 to 53 for the Thunstrasse West and East mid-term road and utility works, coordinating road, utility, traffic and landscape planners. It suits an experienced engineering planning firm or consortium able to manage a complex, high-traffic urban infrastructure project, rather than a climate-specialist startup.

Summary by Raise Lens from the official notice · 22 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The contracting authority, Tiefbau Stadt Bern, is procuring a general management (Gesamtleitung, GL) mandate for the mid-term measures on Thunstrasse West and Ost in Bern, covering SIA phases 32 to 53. The GL will lead the project operationally from the construction design phase through to project completion, ensuring the project objectives are implemented. The mandate includes integrated leadership and coordination of the planning team, including road construction, utility line planning and construction, traffic planning and landscape architecture, along with interfaces to third-party projects and adjacent infrastructure. The GL must account for the constraints of the inner-city, heavily trafficked project perimeter and support the client in technical, organisational, legal and political decision-making. Traffic planning and landscape architecture services are integrated into the GL mandate, and all required planners are organisationally and technically subordinate to the GL. Detailed tasks follow SIA 103, as set out in Annex 1 (service description) and Annex 2 (service table). The contract runs from 31.03.2027 to 30.05.2032 and may be extended. Defects and warranty periods follow SIA 118.

Bidder eligibility

Bidders must meet all eligibility criteria, which are specified in the tender documentation (Pflichtenheft, point 10); the page itself does not list them. Bidders must not be excluded under Art. 44 IVöB 2019 and must provide all Art. 7 IVöBV evidence, including a completed and signed self-declaration, a detailed debt-register extract, and tax, social insurance, pension, SUVA/accident insurance, sickness daily-allowance insurance and collective labour agreement (GAV) confirmations (for construction firms also the FAR confirmation). Bidders must confirm compliance with occupational health and safety rules, working conditions and equal pay. Bidders above the city's invitation-procedure threshold must provide an equal pay analysis under Art. 13a ff. GlG, using a method such as Logib, with the reference month no more than four years old; this may be submitted within 60 days after award. Certificates are valid for one year. Foreign bidders must provide equivalent confirmations from their home country and a Swiss address for service. Consortia are permitted, with a named lead firm and self-declarations from all members. Subcontractors are permitted for non-characteristic services, with characteristic services to be performed by the bidder. Pre-involved tenderers: Kontur Projektmanagement AG is excluded. Emch + Berger AG, Kontextplan and Rudolf Keller & Partner Verkehrsingenieur AG were involved in the interim phase but are admitted to the procedure.

How bids are scored

Bids are scored in a utility-value matrix. Each non-price criterion is rated from 0 to 5 on the grading scale (5 = excellent, 4 = good, 3 = adequate, 2 = partially adequate, 1 = insufficient, 0 = no information), and intermediate grades are allowed. The overall score is the percentage-weighted sum of criteria and sub-criteria, capped at 5. The contract is awarded to the bid with the highest weighted total. Price is an evaluated criterion, but its weighting and the individual criterion weights are not disclosed on this page; they are in the documentation (Pflichtenheft, point 13). No price negotiations will be held, although technical negotiations are reserved.

Key requirements

  • Integrated project lead and coordination of the planning team across SIA phases 32 to 53 per SIA 103
  • Coordination of road construction, utility networks, traffic and landscape architecture within an inner-city, high-traffic perimeter
  • Support to the client on technical, legal and political decisions through project completion

Procurement contact

The notice names a procurement contact for clarification questions.

CPV codes

Relevant sectors

Infrastructure

How this compares

About this sector

Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

Sourcesimap.ch (Switzerland)
Published4 Nov 2026
Closes5 Jan 2027, 17:00 UTC
Buyer typeGovernment
TypeServices
CountrySwitzerland
RegionCH-BE
SubmissionPhysical submission only, no electronic bids. Bids must reach the Fachstelle Bes
Last verified22 Nov 2026

Documents to prepare

Named in this notice. Check the official notice for the full list.

  • Completed and signed self-declaration
  • Detailed debt-register extract
  • Tax confirmations
  • Social insurance confirmations
  • Pension confirmations
  • SUVA/accident insurance confirmation
  • Sickness daily-allowance insurance confirmation
  • Collective labour agreement (GAV) confirmation
  • FAR confirmation (for construction firms)
  • Equal pay analysis under Art. 13a ff. GlG (e.g. Logib), reference month no more than four years old (may be submitted…
  • Equivalent confirmations from home country and Swiss address for service (foreign bidders)
  • Self-declarations from all consortium members

Related tenders