Tender · simap.ch (Switzerland)

St. Gallen University heating and cooling renovation – BKP 242 heat pump

Original: Université de Saint-Gall | Rénovation des installations de chauffage et de climatisation - BKP 242 Pompe à chaleur

Kanton St.Gallen, Bau- und Umweltdepartement, Hochbauamt

Value
Not stated · check listing
Closes
11 Jan 2027
 
Where
Switzerland
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 55 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 17 Nov 202655 days to prepare
Found today · 24 Nov 202648 days to prepare

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Switzerland (CH-SG). It is classified under Heating and Cooling, Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

The University of St. Gallen is replacing its fossil-fuel heating with two geothermal-sourced heat pumps for both heating and cooling, including a borehole field, safety devices, controls and storage. Suited to experienced Swiss HVAC and heat pump installers or contractors able to deliver technical building services works.

Summary by Raise Lens from the official notice · 18 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The Canton of St. Gallen's Hochbauamt (Building Department) is procuring the supply of two heat pumps to replace the fossil-fuel heat generation on the University of St. Gallen campus (Universität St. Gallen, BKP 242 Wärmepumpe). The new machines will provide both heating and cooling. They will be installed in the existing heating and cooling centre, which requires dismantling the current chillers and the two boilers. The offer covers the two heat pumps, safety equipment, and control systems up to and including the storage systems. The new storage units, hydraulic components, system separations and pump groups will be positioned in the freed-up space. Each machine will sit in its own room, with access via an airlock. Ground source (borehole) field units will be installed outside the plant room, using a borehole field behind the sports building as the heat source and sink. The contract is scheduled for execution from 6 February to 30 August 2027, with contract duration from 31 January 2027 to 30 December 2028. The on-site delivery date for the heat pump is 7 February 2028. The contract may be extended. The place of performance is 9000 St. Gallen, Switzerland. Bidders may offer CO2 or NH3 as an alternative natural refrigerant as a variant. Optional items include participation in a performance test at the factory and a surcharge for extended warranty. Partial tenders are not permitted, and bidding consortia are not permitted, though subcontractors are allowed.

Bidder eligibility

EK1 (Capacity): Sufficient personnel and financial resources to deliver on schedule, evidenced via the standard supplier data form with supporting documents. EK2 (Reference installations): Two reference installations, each with a heating capacity of at least 400 kW per machine, using propane, CO2 or NH3 as refrigerant, completed within the last 5 years. Evidence via the standard supplier form and reference sheets for the installations. EK3 (Compliance evidence): Standard participation conditions form with evidence of social insurance contributions and tax compliance, financial stability information, compliance with occupational health and safety and working conditions, GAV (collective labour agreement) compliance certificate where applicable, a self-declaration of gender pay equality and, for firms with more than 100 employees, the Art. 13a GlG pay equality analysis result (or the Art. 13d independent body report or Art. 13b state control confirmation), and sustainability certificates such as ISO 14001 or equivalent. EK4 (Schedule): Proof of schedule compliance, or proof of earlier completion through additional resources.

How bids are scored

Award criteria as disclosed: - ZK1 Quality / delivery assurance (35%): equivalent or better quality of products versus the specification in the bill of quantities, and proof of schedule compliance or earlier completion through additional resources. - ZK2 References and key person (25%): execution of at least three comparable completed projects within the last 5 years, with client assessments, plus training and experience of the key person. - ZK3 Price (25%): offer price for the specified scope, including 8.1% VAT. - ZK4 Maintenance (10%): full maintenance costs over 5 years. - ZK5 Sustainability (5%): a statement of no more than one A4 page on how the contract will be implemented sustainably across society, economy and environment. Price/quality split: price 25% and maintenance-cost 10% (35% total cost-related); quality, references and sustainability make up the remaining 65%.

Key requirements

  • Supply and install two heat pumps for heating and cooling in existing energy centres
  • Install geothermal probe field as heat source and sink, with safety devices and control system
  • Dismantle existing chillers and two boilers, then install storage, hydraulics and circuit separators

Procurement contact

The notice names a procurement contact for clarification questions.

CPV codes

Relevant sectors

How this compares

About this sector

Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

Sourcesimap.ch (Switzerland)
Published17 Nov 2026
Closes11 Jan 2027, 23:59 UTC
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountrySwitzerland
RegionCH-SG
SubmissionOnline only via simap.ch. The entire offer must be submitted as a single searcha
Last verified18 Nov 2026

Documents to prepare

Named in this notice. Check the official notice for the full list.

  • Standard supplier data form with supporting documents
  • Reference sheets for the reference installations
  • Standard participation conditions form
  • Evidence of social insurance contributions and tax compliance
  • Financial stability information
  • Evidence of compliance with occupational health and safety and working conditions
  • GAV (collective labour agreement) compliance certificate where applicable
  • Self-declaration of gender pay equality
  • Art. 13a GlG pay equality analysis result (or Art. 13d independent body report or Art. 13b state control confirmation)…
  • Sustainability certificates such as ISO 14001 or equivalent
  • Proof of schedule compliance, or proof of earlier completion through additional resources
  • Statement of no more than one A4 page on sustainable implementation