This tender has closed. The deadline passed 80 days ago.
You can no longer apply, but the details below are kept for reference, and there are similar open opportunities in the sidebar.
Heating plant construction work – Design and construction of a 10 MW biomass heating installation in Koszalinie, Poland 2026 Tender
organisation
In context
This is a contract notice published by a utility covering construction and works. Bids are invited through an open procedure. Delivery covers Poland and the European Union (Europe). It is classified under Heating and Cooling, Renewable Energy and Sustainable Buildings against the sustainability taxonomy rather than matched on keywords.
This tender procures the complete design, construction, commissioning, and handover of a 10 MW biomass heating plant in Koszalinie, Poland, including all engineering disciplines and regulatory approvals. Bidders must be experienced in large-scale renewable heating infrastructure, with capacity to manage multi-disciplinary design, permitting, and construction delivery.
Unlock the funder, link and full detail
Create a free account to unlock 3 full listings a month, including the funder name, the application link and the complete programme detail.
About this tender
Complete investment project for the design, construction, commissioning and handover of a 10 MW biomass combustion installation at the DPM heating plant in Koszalin, Poland (ul. Mieszka I 20A). The project is divided into two main stages: Stage 1 (Design) involves preparation of comprehensive project documentation including architectural, structural, HVAC, electrical, technological, and telecommunications designs; obtaining building permit and necessary approvals; and developing bills of quantities, investment cost estimates, technical specifications, construction safety plans, and operational …
CPV codes
Relevant sectors
The direct link to bid is a Pro feature.