Rother Housing Maintenance and Repair 2026 Tender
Rother District Council
- Value
- £1.0M
- Closes
- 18 Dec 2026
- Where
- United Kingdom
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 1 Dec. This page is open to everyone now.
In context
This is a contract notice published by a government body covering construction and works. Delivery covers United Kingdom (Europe). It is classified under Energy Efficiency and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Rother District Council seeks a contractor for a 24-month measured term arrangement, with two optional 12-month extensions, covering responsive, planned and improvement repairs across its housing stock. Energy-efficiency and damp/ventilation works are a minority of a broad multi-trade maintenance scope, so a established housing maintenance contractor with gas, electrical and fire-safety capability fits best.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Rother District Council is seeking to appoint a suitably experienced contractor to provide housing repair, maintenance, compliance and refurbishment works across its housing portfolio, including temporary accommodation and newly acquired properties. The contract will cover a range of responsive, planned and improvement works, including property refurbishment; kitchen and bathroom works; electrical, plumbing, heating and gas works; statutory servicing, inspection and certification; fire safety works; building fabric and roofing repairs; damp, mould and ventilation works; environmental and energy-efficiency improvements; accessibility adaptations; void works and clearance; and emergency attendance and making-safe works. Works will be instructed as required through individual works orders under a measured term arrangement. The nature, frequency and value of works will vary during the contract term and no minimum volume or value of work is guaranteed. The initial contract term will be 24 months, with the option for the Council to extend for up to a further two periods of 12 months.
Key requirements
- Multi-trade responsive, planned and improvement housing works under individual works orders
- Gas, electrical, heating, fire safety and statutory compliance capability
- Damp, mould, ventilation and energy-efficiency improvements within a 24-month term with two 12-month extensions
- No guaranteed minimum volume or value of work
Relevant sectors
How this compares
About this sector
About this sector
Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)