HV switchgear, dispatch control and cable connections for wind farms
Original: Electrical apparatus for switching or protecting electrical circuits – Rozvodny VN, dispečerské řízení a zemní přípojky pro větrné elektrárny vč. uvedení výroben do provozu
RenoEnergie, a.s.
- Value
- Not stated · check listing
- Closes
- 2 Dec 2026
- Where
- Czech Republic
- Contract
- Mixed · Corporate
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a corporate buyer covering a mix of works, supplies and services. Delivery covers Czechia (Europe). It is classified under Renewable Energy, Grid Modernisation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
RenoEnergie seeks a turnkey contractor to supply, install and commission a 22 kV cable network, substations SS1, SS2 and SS4 with medium-voltage switchgear, and dispatch control for wind farms in the Czech Republic. Suited to an experienced electrical EPC contractor with substation and grid-connection track record, with SMEs able to sub into cable or civil packages.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
RenoEnergie, a.s. is procuring the complete supply, installation, and commissioning of electrical infrastructure for wind power plants (větrné elektrárny, VtE). The scope is set out in an attached contract for work and in the other annexes to the tender documentation. The main deliverables are: (1) supply and installation of a medium-voltage cable network of 22 kV cables, optical ducts with microducts, and optical cables, running from the wind turbines to switching station SS2 and in a shared cable route from SS2 to SS1; (2) supply and installation of switching stations SS1, SS2, and SS4, including medium-voltage switchgear (primary MV switchgear rated at 1250 A for SS1 and SS2), reactors (tlumivky), other MV and LV equipment, and metering; (3) supply, parameterisation, and agreement with ČEZ Distribuce, and commissioning into trial operation of the whole works, including the UPOS procedure (permitting operation for compliance verification, or issuing a temporary operating notice under PPDS), together with dispatch control and a local control system, in cooperation with the client and the wind plant technology supplier; and (4) cooperation in bringing the wind power plants into permanent operation (UTP). The contract duration and delivery timetable are not stated in the available page text.
Key requirements
- Supply and installation of 22 kV cable network and fibre ducts from wind turbines to substations
- Supply and installation of substations SS1, SS2, SS4 with primary 1250 A MV switchgear and reactors
- Parametrisation, approval with ČEZ Distribuce, commissioning, dispatch control and local control system
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)