Skip to content
Raise Lens
TENDER · TED (EU)governmentworks

HVAC installation work – VG – New fire station Salmtal – heating system 2026 Tender

Original: Heating, ventilation and air-conditioning installation work – VG - Neubau FwGH Salmtal - Heizungsanlage

Verbandsgemeinde Wittlich-Land

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Germany (Europe). It is classified under Heating and Cooling and Energy Efficiency against the sustainability taxonomy rather than matched on keywords.

Summary

This German municipal works tender covers the heating installation for the new fire station building in Salmtal, including an air-water heat pump, a 2000-litre buffer tank, underfloor and industrial surface heating, and stainless steel piping. It suits HVAC installation contractors with heat pump and hydronic system experience who can deliver a single-site works package.

Summary by Raise Lens from the official notice · 30 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The Verbandsgemeinde Wittlich-Land is procuring heating, ventilation and air-conditioning installation work for the new build of the fire station (FwGH) in Salmtal, as indicated by the tender title "VG - Neubau FwGH Salmtal - Heizungsanlage". The extracted page content is a bill of quantities listing the principal heating components to be supplied and installed. The listed scope comprises one modulating air-to-water heat pump in monoblock design (10 to 50 kW), one 2,000-litre heating buffer tank, and one heating manifold with two heating circuits. It also includes 550 m² of underfloor heating with four underfloor heating distributors (pressure-differential independent), 595 m² of industrial surface heating with three industrial distributors, and approximately 350 m of stainless steel heating pipework with diameters from DN15 to DN50. The page does not state the contract duration, delivery or completion dates, or the scope of any ancillary works beyond the itemised heating components.

Key requirements

  • ✓Supply and install 1 air-water heat pump monoblock, modulating 10–50 kW
  • ✓Install 2000-litre buffer tank, manifold with two heating circuits, and differential-pressure-independent distributors
  • ✓Install 550 m² underfloor heating and 595 m² industrial surface heating, plus 350 m stainless steel piping DN15–DN50

CPV codes

About this sector

Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.