Skip to content
Raise Lens
TENDER · TED (EU)governmentworks

Implementation of Brno city flood protection measures, stages IX, X, XI 2026 Tender

Original: Construction work – Realizace protipovodňových opatření města Brna - Etapy IX,X,XI – výběr zhotovitele

statutární město Brno

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Czechia (Europe). It is classified under Water, Climate Adaptation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

The City of Brno is procuring a works contractor under a FIDIC-based construction contract to build flood protection measures in stages IX, X and XI, including related earthworks and landscaping. It suits established civil engineering contractors with flood-defence and large public works experience, not early-stage firms.

Summary by Raise Lens from the official notice · 28 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The procurement concerns the award of a works contract for the implementation of flood protection measures in the City of Brno, Stages IX, X and XI (Realizace protipovodňových opatření města Brna - Etapy IX, X, XI). The contract is governed by the FIDIC Red Book (1st edition, 1999) construction conditions, in the Czech translation published by CACE in 2017, together with the other documents forming the contract. The contractor will carry out construction works for the flood protection measures, including the related earthworks and landscape adjustments. The full list of construction objects is set out in Annex No. 7 of the tender documentation (Technical Specification). Activities are further described in section 4.2.4 of the tender documentation. The works are divided into four sections: Section 1 covers relocations (přeložky); Section 2 covers project objects with eligible expenditure; Section 3 covers project objects with ineligible expenditure; and Section 4 covers objects outside the project. Details of each section are provided in Annex No. 7. The expected duration of the works is not stated in the extracted text.

Key requirements

  • ✓FIDIC Red Book 1999 based construction contract (CACE Czech translation 2017)
  • ✓Sections 1-4 covering diversions, co-financed and non-eligible flood objects, and off-project objects
  • ✓Includes related earthworks and landscaping; full object list in ZD annex 7

Relevant sectors

About this sector

Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.