Implementation of Brno flood protection measures, stages IX, X, XI – contractor selection 2026 Tender
Original: Construction work – Realizace protipovodňových opatření města Brna - Etapy IX,X,XI – výběr zhotovitele
statutární město Brno
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Czechia (Europe). It is classified under Water, Climate Adaptation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
The City of Brno is procuring construction contractors under a FIDIC-based works contract to build flood protection measures in stages IX, X and XI, including related earthworks and landscaping. Suited to established civil engineering contractors capable of large-scale river and flood-defence works, with subcontracting opportunities for smaller firms.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The City of Brno (statutární město Brno) is procuring a works contractor for the realisation of flood protection measures in Brno, Stages IX, X and XI, under a single construction contract. The contract is based on the FIDIC Red Book (1st edition, 1999) General Conditions for building and engineering works designed by the Employer, in the Czech translation published by CACE in 2017, together with the other contract documents. The contractor will carry out construction works for the construction of flood protection measures, including related earthworks and landscaping, under the conditions specified in the contract. The scope includes in particular the activities listed in clause 4.2.4 of the tender documentation. A complete list of the construction objects is given in Annex No. 7 to the tender documentation. The works are divided into four Sections: Section 1 covers relocations (přeložky) of construction objects; Section 2 covers project construction objects classified as eligible expenditure; Section 3 covers project construction objects classified as ineligible expenditure; and Section 4 covers construction objects outside the project. Section details are set out in Annex No. 7 (Technical Specification). Expected duration and deliverable milestones are not stated in the extracted text.
Key requirements
- ✓Construction works under FIDIC Red Book 1999 conditions (Czech CACE translation 2017)
- ✓Flood protection structures across Sections 1-4, including diversions and related terrain and landscape works
- ✓Contract documentation and technical specification in Annex 7 of tender documents
CPV codes
Relevant sectors
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →