Skip to content
Raise Lens
TENDER · india-cppgovernmentworks

Improvement of MoRTH Identified Blackspots through construction of Grade Separators at Selected locations along NH 75 Corridor BW Km.216.91 to Km.302.42 with an effective improvement Length 25.6 Km under NH(O) on EPC mode in the State of Karnataka 2026 Tender

--

In context

This is a contract notice published by a government body covering construction and works. Delivery covers India (Asia). It is classified under Climate Adaptation against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures construction of grade separators (highway interchanges) at accident blackspots along a 25.6 km stretch of National Highway 75 in Karnataka, India, under an EPC (Engineering, Procurement, Construction) contract. Bidders should be large civil engineering and infrastructure contractors with experience in highway safety improvements and grade separator construction.

Summary by Raise Lens from the official notice · 18 Sept 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Improvement of MoRTH Identified Blackspots through construction of Grade Separators at Selected locations along NH 75 Corridor BW Km.216.91 to Km.302.42 with an effective improvement Length 25.6 Km under NH(O) on EPC mode in the State of Karnataka

Key requirements

  • ✓Construction of grade separators at MoRTH-identified blackspots on NH 75
  • ✓Project scope: Km 216.91 to Km 302.42 with 25.6 km effective improvement length
  • ✓EPC mode delivery in Karnataka state
  • ✓Highway safety and accident reduction focus

Relevant sectors

About this sector

Climate adaptation funding helps communities, infrastructure and businesses prepare for heat, flooding, drought and sea level rise. Most of it is public and multilateral money, often targeted at vulnerable regions and delivered with local government. Calls usually ask for a climate risk assessment and evidence that local people shaped the plan.