Installation of air-conditioning systems to cool one room across 37 Chelles schools

Original: Travaux d'installation de systèmes de climatisation pour le rafraîchissement d'une pièce dans les 37 écoles de la Ville de Chelles

VILLE DE CHELLES

Value
Not stated · check listing
Closes
1 Dec 2026
 
Where
France
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 26 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 5 Nov 202626 days to prepare
Found today · 26 Nov 20265 days to prepare

In context

This is a contract notice published by a government body covering construction and works. Delivery covers France and the European Union (Europe). It is classified under Heating and Cooling and Climate Adaptation against the sustainability taxonomy rather than matched on keywords.

Summary

The City of Chelles is procuring works to install air-conditioning systems that cool one room in each of its 37 schools, with preparation starting January 2027 and cooling zones targeted for end of April 2027. Suited to an installation contractor or SME with HVAC works capacity, potentially as a subcontractor.

Summary by Raise Lens from the official notice · 20 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The City of Chelles (Seine-et-Marne, 77) is procuring works to install air-conditioning systems that cool one room in each of its 37 schools. The contract is a works contract (CPV 45331220, main descriptor) with its principal place of execution in Chelles. It is divided into two lots. Lot 1 covers HVAC (CVC) works: installation of air-conditioning units, the terminal electrical connections of the CVC equipment to the connection points provided by Lot 2, and ancillary works. Lot 2 covers electrical works: electrical links for the CVC equipment, placing the electrical links in standby on junction boxes, and supplying protection devices matched to the power drawn by each CVC unit. The CPV codes are 45331200 for Lot 1 and 45311000 for Lot 2. The contract runs for 4 months from the date of the notification that serves as the works order. The first 4 weeks are a preparation period, with a provisional start on 11 January 2027. The City wants as many cooling zones as possible operational by the end of April 2027. A mandatory individual site visit is scheduled for Wednesday 18 November 2026 across three school complexes (Aulnes, Mont-Chalat and Fournier). The full tender documents (DCE) and the rules for downloading them and submitting offers are set out in the Règlement de la Consultation (RC).

Bidder eligibility

Candidates must submit: a letter of application; proof that the signatory is authorised to bind the company; a sworn statement that the candidate is not excluded under articles L.2141-1 to L.2141-5 and L.2141-7 to L.2141-11 of the Code de la commande publique; and, in the case of judicial recovery, copies of the court judgments (details in article 7.1 of the RC). Economic and financial capacity: a statement of overall turnover and, where relevant, turnover in the field covered by the contract, for the last three available financial years; appropriate bank statements or proof of professional risk insurance; and tax and social security certificates. Technical and professional capacity: a statement of average annual headcount and supervisory staff over the last three years; a description of tools, equipment and technical facilities; a list of works performed over the last five years with attestations; professional qualification certificates; and an asbestos-risk prevention training certificate (details in article 7.1 of the RC).

How bids are scored

Not disclosed in the notice. The notice states that the award criteria are set out in the Règlement de la Consultation. The notice also indicates that a negotiation phase may follow, in writing or by hearing, under the terms described in the RC, and that award without negotiation is possible. No price/quality split or weightings are stated.

Lots

  • Lot 1: CVC - Système de climatisation

    Installation of air-conditioning systems, terminal electrical connections of CVC equipment to the Lot 2 connection points, and ancillary works.

  • Lot 2: Electricité

    Electrical links for the CVC equipment, placing electrical links on standby on junction boxes, and supply of protection devices matched to the power of each CVC unit.

Key requirements

  • Install air-conditioning systems for one cooled room in each of 37 schools
  • Four-month contract including a four-week preparation period from notification
  • Cooling zones operational by end of April 2027; preparation starts 11 January 2027

Procurement contact

The notice names a procurement contact for clarification questions.

CPV codes

How this compares

About this sector

Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceBOAMP (France)
Published4 Nov 2026
Closes1 Dec 2026, 12:00 UTC
Buyer typeGovernment
TypeWorks
DeliveryOn-site
Site visitRequired
CountryFrance
RegionEurope
SubmissionElectronic submission only, via the buyer's profile on achatpublic.com (per arti
Last verified20 Nov 2026

Documents to prepare

Named in this notice. Check the official notice for the full list.

  • Letter of application
  • Proof that the signatory is authorised to bind the company
  • Sworn statement that the candidate is not excluded under articles L.2141-1 to L.2141-5 and L.2141-7 to L.2141-11 of…
  • Copies of court judgments (in the case of judicial recovery)
  • Statement of overall turnover and turnover in the field covered by the contract, for the last three available…
  • Appropriate bank statements or proof of professional risk insurance
  • Tax and social security certificates
  • Statement of average annual headcount and supervisory staff over the last three years
  • Description of tools, equipment and technical facilities
  • List of works performed over the last five years with attestations
  • Professional qualification certificates
  • Asbestos-risk prevention training certificate