Skip to content
Raise Lens

This tender has closed.

You can no longer apply, but the details below are kept for reference, and there are similar open opportunities in the sidebar.

TENDER · spain-pcspgovernmentmixed

Installation of integrated wildfire prevention and early detection technology, La Yesa 2026 Tender

Original: Instalación, configuración y puesta en marcha de solución tecnológica integral, para la prevención, monitorización, detección temprana y gestión del riesgo de incendios en La Yesa

Alcaldía del Ayuntamiento de La Yesa

In context

This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Spain (Europe). It is classified under Climate Adaptation against the sustainability taxonomy rather than matched on keywords.

Summary

The Ayuntamiento de La Yesa is procuring the installation, configuration and commissioning of an integrated technology system for wildfire prevention, monitoring, early detection and risk management. A small technology integrator or SME with sensor, monitoring or fire-detection installation experience would fit this single-contract, municipal-scale job.

Summary by Raise Lens from the official notice · 18 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The Ayuntamiento de La Yesa (Valencia, Spain) is procuring the installation, configuration and commissioning of an integrated technological solution for fire prevention, monitoring, early detection and wildfire risk management in the municipality of La Yesa. The contract is classified as a supply contract (Suministros) and covers a mix of hardware, software and installation work. The CPV codes indicate meteorological instruments (38120000), video surveillance systems (32323500), smoke detectors (38431200), installation of telecommunications equipment (45314000), and software supply services (72268000). The tender was published on 16/10/2026 under the simplified open procedure (Abierto simplificado), as an ordinary processing tender with no EU funding. Offers must be submitted electronically. The base budget without taxes and the estimated contract value are both EUR 27,000.00. The page does not state the expected duration of the works or services, the detailed technical specifications, or the deliverables beyond the subject matter. These details would be in the tender documents (Pliego), which are referenced on the page but not reproduced in the text provided.

Bidder eligibility

Not stated on the page. Bidder eligibility requirements would be set out in the tender documents (Pliego), which were not included in the page text.

How bids are scored

Not stated on the page. The price/quality split and scoring weightings would be set out in the tender documents (Pliego), which were not included in the page text.

Key requirements

  • ✓Supply, installation and configuration of an integrated fire prevention and monitoring technology solution
  • ✓Early wildfire detection and risk management capability for the municipality of La Yesa
  • ✓Commissioning (puesta en marcha) of the system, with a total budget of about €27,000 excluding VAT

Relevant sectors

How this compares

  • Compared with 128 similar tenders (adaptation in Spain) listed in the last 12 months.
  • Its value of $36k is above 4% of the 114 similar tenders that state a value; their median is $228k.
  • It allows 18 days to respond, longer than the typical 17 days across 118 similar tenders.
  • This is the only similar tender from this organisation listed here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Climate adaptation funding helps communities, infrastructure and businesses prepare for heat, flooding, drought and sea level rise. Most of it is public and multilateral money, often targeted at vulnerable regions and delivered with local government. Calls usually ask for a climate risk assessment and evidence that local people shaped the plan.