Installation work of cooling equipment – small refrigeration kitchen, Zoo restaurant at playground 2026 Tender
Original: Installation work of cooling equipment – Kleinkälte Küche Zoo Restaurant am Spielplatz
Stadt Frankfurt am Main - Amt für Bau und Immobilien
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Germany (Europe). It is classified under Heating and Cooling and Methane and Super Pollutants against the sustainability taxonomy rather than matched on keywords.
The tender procures installation of a small commercial refrigeration system for a restaurant kitchen, including a two-stage CO2 (R744) booster plant, air-cooled gas cooler, evaporators, 185 m of refrigerant piping, a gas warning system and commissioning. It suits HVAC and refrigeration installers with experience in natural-refrigerant commercial systems and F-gas compliance.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The procurement covers the installation of commercial refrigeration equipment for the kitchen of the Zoo restaurant at the Spielplatz (playground), commissioned by the City of Frankfurt am Main, Amt für Bau und Immobilien. The scope is a small-commercial refrigeration system of approximately 7.2 kW, configured as a booster system with a two-stage compound refrigeration unit (6.3 kW medium-temperature/NK and 1.2 kW low-temperature/TK). Listed components include an air-cooled R744 (CO2) gas cooler, air coolers for NK and TK circuits, condensate drain lines, about 185 m of refrigerant piping, a gas warning system, a multicenter unit, electrical installation, and commissioning. The page does not state the contract duration or delivery period.
Key requirements
- ✓Two-stage CO2 (R744) booster refrigeration plant of about 7.2 kW with medium- and low-temperature circuits
- ✓Air-cooled gas cooler, air coolers for NK and TK, condensate drain lines and about 185 m of refrigerant piping
- ✓Gas warning system, multicenter control, electrical installation and commissioning
CPV codes
Relevant sectors
About this sector
Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →