ITT - Swindon Archive Decarbonisation Design Team (UID 320) Tender
organisation
In context
This is a contract notice published by a government body covering consulting. Delivery covers United Kingdom (Europe). It is classified under Energy Efficiency against the sustainability taxonomy rather than matched on keywords.
A UK heritage body is procuring a multidisciplinary design team to take its Swindon national archive decarbonisation project through RIBA Stage 3, replacing end-of-life environmental control systems and improving fabric performance to support net-zero by 2040. Suited to architecture, building services and energy engineering consultancies, including SMEs, able to deliver low-carbon retrofit design for specialist archive environments.
Unlock the funder, link and full detail
Create a free account to unlock 3 full listings a month, including the funder name, the application link and the complete programme detail.
About this tender
The funder is procuring a multidisciplinary design team to develop the Archive Decarbonisation Project at its national archive facility in Swindon, through RIBA Stage 3 (Spatial Coordination). The facility is a purpose-built archive store constructed in 1993 to BS5454 standards. Its building services plant has reached or exceeded operational life, and the project aims to support the funder's net-zero carbon by 2040 commitment. A RIBA Stage 2 feasibility study has been completed. …
Relevant sectors
The direct link to bid is a Pro feature.