This tender closed on 18 November 2026. The deadline passed 7 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
- Kyrgyz hydro optimization and modernization study
- Kyrgyz Republic, Design, supply and installation of Isanova substation 220 kV
- KGZ: Toktogul Rehabilitation Phase 3 Project - KGZ-ADB-TRPP3-QCBS-1 Consulting services for modernization and expansion of the centralized data collection and processing system (MDM system) at OJSC “Kyrgyz Energy Settlement Center” (KESC)) (E-049013-002)
Kyrgyz Republic, Environmental Specialist for Bystrovskaya Small HPP and 110 kV Lower Tar – Kara-Kuldzha Transmission Line
Ministry of Energy KR
- Value
- Not stated · check listing
- Closes
- 18 Nov 2026Closing date passed
- Where
- Kyrgyzstan
- Contract
- Consulting · Multilateral
In context
This is a contract notice published by a multilateral institution covering consulting. Delivery covers Kyrgyzstan (Asia). It is classified under Renewable Energy, Grid Modernisation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
The Ministry of Energy of the Kyrgyz Republic is recruiting an environmental specialist to support environmental oversight of the Bystrovskaya small hydropower plant and the 110 kV Lower Tar – Kara-Kuldzha transmission line. A qualified individual environmental consultant or small firm with hydropower or transmission EIA and monitoring experience fits best.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
A multilateral buyer based in Kyrgyzstan is seeking an environmental specialist to provide environmental oversight for two energy infrastructure projects in the country: the Bystrovskaya small hydropower plant and the 110 kV Lower Tar to Kara-Kuldzha transmission line. The role sits within a consulting contract, and the buyer is looking for someone able to cover environmental oversight across both the hydropower and transmission works. The requirements centre on relevant environmental assessment and monitoring experience within energy infrastructure. Bidders are expected to show that they have carried out this type of work, and the specialist role is framed around the Bystrovskaya project alongside the transmission line. The tender was published on 11 November 2026 and closes on 18 November 2026.
Key requirements
- Environmental specialist role for the Bystrovskaya small HPP project
- Environmental oversight covering the 110 kV Lower Tar – Kara-Kuldzha transmission line
- Relevant environmental assessment and monitoring experience in energy infrastructure
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)