Skip to content
Raise Lens
Tender · SAM.gov

Lock And Dam 25 New 1,200 Ft Lock Navigation And Ecosystem Sustainability Program (nesp)

W07V ENDIST ST LOUIS

Value
Not stated · check listing
Closes
9 Dec 2026
 
Where
United States
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

Pro early accessIn public feeds and alerts from 28 Nov. This page is open to everyone now.

Raise Lens Pro

With Pro you could have had 18 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 21 Nov 202618 days to prepare
Found today · 25 Nov 202614 days to prepare

In context

This is a contract notice published by a government body covering construction and works. Delivery covers United States (North America). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

USACE St. Louis District is procuring construction for a new 1,200-foot navigation lock at Lock and Dam 25, paired with an ecosystem sustainability program to offset navigation impacts. Large prime civil-engineering contractors with heavy marine and lock construction experience are the realistic bidders, not small startups.

Summary by Raise Lens from the official notice · 24 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The U.S. Army Corps of Engineers, St. Louis District (Mississippi Valley Division), is soliciting proposals for the Lock and Dam 25 New 1,200 Ft Lock Navigation and Ecosystem Sustainability Program (NESP), Notice ID W912P926RA004. The requirement is construction of a new 1,200-foot drilled shaft-founded lock in the auxiliary miter gate bay at Lock and Dam 25, located at 10 Sandy Slough Road, Winfield, Missouri. The bay was identified as Location 3 in the 2004 System Feasibility Study. The contract includes a new 1,200-foot upstream ported guard wall and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place and will become an auxiliary chamber, used mainly for recreation traffic or when the new lock is out of service. The new lock will be built in the downstream direction. The full solicitation is not reproduced on the page. Plans (Volumes 1-7, Attachment 0004) and a Navisworks Federated Model (Attachment 0005) must be requested by email from the contract specialist and are delivered via DoD SAFE. Amendments 0001 through 0007 have been issued, covering bidder questions and answers, a proposal due date extension, updates to Section 00 21 16, and wage determinations. The page does not state the contract period of performance.

Key requirements

  • Construction of a new 1,200 ft navigation lock at Lock and Dam 25 on the Upper Mississippi River
  • Ecosystem sustainability and restoration components under the Navigation and Ecosystem Sustainability Program (NESP)
  • Large-scale civil and marine construction capacity expected from the bidder

Procurement contact

The notice names a procurement contact for clarification questions.

Relevant sectors

Water tendersInfrastructure

How this compares

About this sector

Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceSAM.gov
Published20 Nov 2026
Closes9 Dec 2026, 16:00 UTC
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountryUnited States
RegionNorth America
SubmissionProposals submitted through the PIEE Solicitation Module (link for W912P926RA004
Last verified24 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)