LOS 1 Hydraulic Control and Distribution Line Auxiliary Systems Pradella Power Plant
Original: LOS 1 Hydraulische Steuerung und Verteilleitung Hilfssysteme Kraftwerk Pradella
Engadiner Kraftwerke AG
- Value
- Not stated · check listing
- Closes
- 2 Dec 2026
- Where
- Switzerland
- Contract
- Mixed · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Switzerland (CH-GR). It is classified under Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Engadiner Kraftwerke AG is renewing the hydraulic water and oil control systems of four Francis turbines at the Pradella hydropower plant, including design, supply, installation, commissioning, pipework, and decommissioning of old equipment. Bidders suited to this are specialist hydropower engineering and hydraulic-equipment contractors with turbine retrofit experience.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Die Engadiner Kraftwerke AG erneuert im Kraftwerk Pradella die seit Anfang der 1970er-Jahre betriebenen hydraulischen Wasser- und Ölsteuerungssysteme der vier Francisturbinen. Gegenstand des Auftrags sind insbesondere die Planung, Auslegung, Herstellung, Lieferung, Montage, Prüfung und Inbetriebsetzung der neuen Hydraulikaggregate, Rohrleitungen und zugehörigen Komponenten für die Ansteuerung der Kugelschieber, Leitapparatservomotoren und Druckregler. Der Auftrag umfasst zudem die Erneuerung der Druckschachtentleerung und der Druckschachtrestentleerung, der Steuerleitung sowie des Revisionsschiebers für die Bewässerung Sent. Ebenfalls Bestandteil des Leistungsumfangs sind sämtliche erforderlichen Demontage- , Rückbau- und Entsorgungsarbeiten an den bestehenden Anlagenteilen sowie die notwendigen Dokumentations-, Koordinations- und Nachweisleistungen. Mit der Erneuerung sollen die Betriebssicherheit, Verfügbarkeit und Wirtschaftlichkeit der Kraftwerksanlage langfristig gewährleistet werden.
Key requirements
- Design, manufacture, supply and installation of new hydraulic power units and piping for turbine control
- Commissioning, testing and integration with ball valves, wicket gate servomotors and pressure regulators
- Dismantling, removal and disposal of existing equipment, plus documentation and coordination services
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)